2021
DOI: 10.3389/fbuil.2021.638507
|View full text |Cite
|
Sign up to set email alerts
|

Getting It Right on the Policy Prioritization for Rail Decarbonization: Evidence From Whole-Life CO2e Emissions of Railway Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1

Relationship

3
5

Authors

Journals

citations
Cited by 15 publications
(9 citation statements)
references
References 23 publications
0
9
0
Order By: Relevance
“…The LCA reflects the amounts of energy consumption and CO2 emissions at each stage of the life cycle. Some researchers have pointed out that LCA analysis results can lead to reductions in the long-term effects on humans and wildlife, improvement in the quality of products, and decreased amounts of GHG emission (Patra, 2007;Banar and Ozdemir, 2015;Rungskunroch et al, 2021aRungskunroch et al, , 2021bRungskunroch et al, , 2021c. As shown in Figure 3, the life cycle of a HSR network contains four stages: (i) the manufacturing, pre-assembly and logistics stage of where LCE = life cycle of energy consumption; LCCO2 = life cycle of CO2 emissions; ECi = total energy consumption (GJ) in stage i; CEi = total CO2 emission (t) in stage i; i = {manufacturing and pre-assembly, operation, maintenance, demolition}.…”
Section: Lca For Hsr Networkmentioning
confidence: 99%
“…The LCA reflects the amounts of energy consumption and CO2 emissions at each stage of the life cycle. Some researchers have pointed out that LCA analysis results can lead to reductions in the long-term effects on humans and wildlife, improvement in the quality of products, and decreased amounts of GHG emission (Patra, 2007;Banar and Ozdemir, 2015;Rungskunroch et al, 2021aRungskunroch et al, , 2021bRungskunroch et al, , 2021c. As shown in Figure 3, the life cycle of a HSR network contains four stages: (i) the manufacturing, pre-assembly and logistics stage of where LCE = life cycle of energy consumption; LCCO2 = life cycle of CO2 emissions; ECi = total energy consumption (GJ) in stage i; CEi = total CO2 emission (t) in stage i; i = {manufacturing and pre-assembly, operation, maintenance, demolition}.…”
Section: Lca For Hsr Networkmentioning
confidence: 99%
“…Recent estimates suggested that the construction of ballasted track emits 4.7 t-CO 2 e/km. 19 Although this figure included catenary wires which would not be the case on Canadian freight railways, the distance over which raw materials are shipped for construction in the UK would also be much shorter.…”
Section: Railway Equipment and Trackmentioning
confidence: 99%
“…HSR stations close to central business districts are able to increase job rates because secured and convenient services are offered to workers [21,[38][39][40]. Also, workplaces within walking distance of HSR stations can become an essential criterion for job seekers and new businesses for greener urban innovation towards net zero or even negative emissions [41,42].…”
Section: Policy Implicationsmentioning
confidence: 99%