2001
DOI: 10.1080/00207540110056171
|View full text |Cite
|
Sign up to set email alerts
|

Graph-based set-up planning and tolerance decomposition for computer-aided fixture design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
23
0

Year Published

2003
2003
2021
2021

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 71 publications
(23 citation statements)
references
References 0 publications
0
23
0
Order By: Relevance
“…[ 81] PR W uetal. [82] PR, DC, UR Xiong et al [83] P R ,T R ,D C Wu et al [43] PR, TR, DC Zhang et al [77] PR,TR N ela t urietal. [14] P R,DC,CP Zhou et al [1] P R ,D C ,C P FP% 28% 28% 28% 23% 40% UD Nee et al [60] PR, TR, DC, UR An et al [45] PR Cecil [84] P R , D C B o y l e e t a l .…”
Section: Intelligent Approaches To Fixture Design Systemsmentioning
confidence: 99%
See 1 more Smart Citation
“…[ 81] PR W uetal. [82] PR, DC, UR Xiong et al [83] P R ,T R ,D C Wu et al [43] PR, TR, DC Zhang et al [77] PR,TR N ela t urietal. [14] P R,DC,CP Zhou et al [1] P R ,D C ,C P FP% 28% 28% 28% 23% 40% UD Nee et al [60] PR, TR, DC, UR An et al [45] PR Cecil [84] P R , D C B o y l e e t a l .…”
Section: Intelligent Approaches To Fixture Design Systemsmentioning
confidence: 99%
“…[ 81] PR W angetal. [31] PR,CR,UR Wu et al [43] P R , D C Zhang et al [77] PR,TR W uetal. [82] P R ,T R ,A R Zhou et al [78] P R ,T R Y a oe ta l .…”
Section: Intelligent Approaches To Fixture Design Systemsmentioning
confidence: 99%
“…And process planning and scheduling could also be recorded in an AND/OR graph where each node of the AND/OR graph represented an operation which could be processed on alternative machines, directed edge denoted the precedence relationship between two consecutive operations (Wong et al 2012).Setup planning bridges gap between product designing and product manufacturing, and plays an important role in integrating design with process planning and fixture design. In order to do setup planning automatically, directed graph was used to express features and tolerance relationships, where the manufacturing features were defined as the vertexes and the relative tolerances relations were defined as the directed edges (Zhang et al 2001;X. Sun et al 2010).…”
Section: Introductionmentioning
confidence: 99%
“…Zhang and Lin (1999) introduced the concept of hybrid graph and used tolerance as the critical constraint for set-up planning. Zhang (2001) applied tolerance decomposition, fixture design and manufacturing resource capability to set-up planning. Ong et al (2002) proposed a hybrid approach to set-up planning optimisation using genetic algorithms (GAs) and simulated annealing, based on a precedence relationship matrix.…”
Section: Introductionmentioning
confidence: 99%