Ground Fault Temporary Overvoltages in MV Networks: Evaluation and Experimental Tests

Abstract: Single-phase-to-ground faults may cause substantial temporary overvoltages (TOVs) in large radial medium-voltage networks with isolated neutral, even over 3-p.u. phase to ground. Resonant neutral earthing limits these overvoltages to 1.8 p.u. but credible earthing apparatus failures might trigger TOVs up to 2.4 p.u. This paper presents the ground fault study of an Italian 20-kV ENEL Distribuzione network. Analytical evaluations in a wide parametric range of neutral earthing arrangements, include isolated neutr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

2
16
0

Year Published

2014
2014
2021
2021

Publication Types

Select...
8
2

Relationship

1
9

Authors

Journals

citations
Cited by 50 publications
(20 citation statements)
references
References 11 publications
2
16
0
Order By: Relevance
“…This is a not uncommon occurrence, as the temporary overvoltages can be substantial: if the network neutral is grounded by means of Petersen coil, also equipped with a parallel high resistance, the Earth-Fault-Factor (EFF) is 1.73 p.u., whereas in networks with ungrounded neutral EFF can attain 2.5-3.5 p.u. [1]. In both cases, the associated switching overvoltages are in the 2.7-4.5 p.u.…”
Section: Introductionmentioning
confidence: 93%
“…This is a not uncommon occurrence, as the temporary overvoltages can be substantial: if the network neutral is grounded by means of Petersen coil, also equipped with a parallel high resistance, the Earth-Fault-Factor (EFF) is 1.73 p.u., whereas in networks with ungrounded neutral EFF can attain 2.5-3.5 p.u. [1]. In both cases, the associated switching overvoltages are in the 2.7-4.5 p.u.…”
Section: Introductionmentioning
confidence: 93%
“…Thus, only three cu phase earth faults y dangerous states. icular phase equals Consequently, the between the other te is present on the [16,21,22]. This ctric shock due to henomena such as etc.…”
Section: Converter Operation Without Fourth Legmentioning
confidence: 99%
“…Samples -grounding -were carried out at the terminal block of the second phase belonging to the line LES 20 kV (to the pillar No. 1) by mounting a shortcircuit cable with its connection to the pole earth inlet (grounding) [3], [12], [13], [14].…”
Section: Tests For Comparative Analysis Between the Two Treatment Metmentioning
confidence: 99%