2008
DOI: 10.1109/aero.2008.4526662
|View full text |Cite
|
Sign up to set email alerts
|

Ground Systems and Flight Operations of the THEMIS Constellation Mission

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2008
2008
2014
2014

Publication Types

Select...
5
1
1

Relationship

3
4

Authors

Journals

citations
Cited by 16 publications
(8 citation statements)
references
References 4 publications
0
8
0
Order By: Relevance
“…The [5], [6]. The simultaneous launch of five new spacecraft almost tripled the number of active satellites to be managed by the operations group at UCB/SSL.…”
Section: Multi-mission Operations At Uc Berkeleymentioning
confidence: 99%
“…The [5], [6]. The simultaneous launch of five new spacecraft almost tripled the number of active satellites to be managed by the operations group at UCB/SSL.…”
Section: Multi-mission Operations At Uc Berkeleymentioning
confidence: 99%
“…[3,5] The THEMIS and ARTEMIS probes were designed and implemented as spin-stabilized instrument platforms with a nominal spin rate of 20 rpm. Two pairs of spin-plane wire booms extending out to 卤25 m and 卤20 m, respectively, two axial stacer booms, and two magnetometer booms were deployed on orbit.…”
Section: Concept Of Operationsmentioning
confidence: 99%
“…2. SatTrack-a comprehensive COTS software suite that controls, monitors, coordinates and automates most aspects of the ground system, such as the completely automated operation of the Berkeley Ground Station, scheduling, maintaining and disseminating the operational pass schedule for all active satellites, routing command and telemetry streams between ground stations and command and telemetry workstations, and autonomously configuring ITOS and other software clients prior to each pass support (Bester et al 2008). The SatTrack Suite also generates and distributes daily-updated orbital data products necessary for science planning, pass support, and maneuver execution.…”
Section: Software Toolsmentioning
confidence: 99%
“…Following an initial 30-day on-orbit check-out and science instrument commissioning period, the probes were placed into nearly identical, temporary coast phase orbits to control orbital dispersions. Mission orbit placement in preparation for the first winter observing season commenced in early September 2007, and the constellation was fully deployed by mid January 2008 (Bester et al 2008;Frey et al 2008).…”
Section: Introductionmentioning
confidence: 99%