2019
DOI: 10.26444/aaem/100534
|View full text |Cite
|
Sign up to set email alerts
|

Health Behaviours in Scaffold Use Risk Assessment Model – SURAM

Abstract: Introduction. Problems concerning occupational safety and health are commonly found in the construction industry, including falling materials, tools or people from a height, stepping on objects, and injuries caused by hand tools. An important factor in occupational safety in the construction industry is the use of scaffolds. All scaffolds used in construction, renovation, repair (including isolating, painting and decorating) and demolition, should be erected, maintained and dismantledin accordance with safety … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 22 publications
0
3
0
Order By: Relevance
“…On the contrary, people tend to rely heavily on their own or experience and knowledge from those close to them to make health decisions. 36 When a person realizes the health benefits of the vaccine, even though she may have only heard of the HPV vaccine, she will actively search for information about the HPV vaccine and consult professionals about making an appointment for vaccination. This scenario suggests a possible way of guiding health interventions to improve HPV vaccination among female freshmen, and the benefit of receiving the HPV vaccination should be specially addressed, rather than focusing only on HPV-related knowledge.…”
Section: Discussionmentioning
confidence: 99%
“…On the contrary, people tend to rely heavily on their own or experience and knowledge from those close to them to make health decisions. 36 When a person realizes the health benefits of the vaccine, even though she may have only heard of the HPV vaccine, she will actively search for information about the HPV vaccine and consult professionals about making an appointment for vaccination. This scenario suggests a possible way of guiding health interventions to improve HPV vaccination among female freshmen, and the benefit of receiving the HPV vaccination should be specially addressed, rather than focusing only on HPV-related knowledge.…”
Section: Discussionmentioning
confidence: 99%
“…The survey data were collected from January 2016 to December 2018 during the on-going research project called "Model of the assessment of risk of the occurrence of building catastrophes, accidents and dangerous events at workplaces with the use of scaffolding" ("ORKWIZ"). The surveys and questionnaires were prepared by a team from the Lublin University of Technology, under the leadership of K. Czarnocki [57]. From 1500 people working on the examined 120 construction sites (during the testing of 120 scaffoldings), 573 employees took part in the study (573 surveys were carried out among people working at the construction site of the examined scaffoldings).…”
Section: Surveysmentioning
confidence: 99%
“…[24][25][26][27][28][29][30]) as part of the studies during one working week: scaffolding inventories (including detailed geodesic measurements), damage inventories, service load inventories, wind action measurements, free vibration measurements, measurements of the scaffoldings vibration resulting from the operation of construction machines, measurements of forces in supports, bearing capacity studies, the load-bearing capacity of anchors, measurements of temperature, pressure, sound pressure levels, lighting, as well as surveys on general information regarding scaffolding and its users, an analysis of the compliance with health and safety regulations, a construction site organisation analysis, scaffolding user surveys, measurements of the user's energy expenditure and changes in their other physiological parameters when working on a scaffolding. On the basis of the results of the studies a potential accident risk assessment model was constructed, the elements of which were described in [25][26][27]30,31]. The results of measurements of service loads were used in the aforementioned model to assess the probability of a scaffolding failure during one working week at the maximum load determined during the measurements.…”
Section: Introductionmentioning
confidence: 99%