2020
DOI: 10.1016/j.est.2020.101336
|View full text |Cite
|
Sign up to set email alerts
|

High reliability storage systems for genset cranking

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
18
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(18 citation statements)
references
References 24 publications
0
18
0
Order By: Relevance
“…The railway system model was implemented in a rail simulator based on the 'quasi static' backwards looking method, due to its short simulation times for estimating energy consumption of vehicles following an imposed speed cycle [46]. The rail simulator is a multi-stage program, implemented in Visual Basic and Fortran language and operating in MS-DOS and the Microsoft Excel workspace [59][60][61], including:…”
Section: Simulation Proceduresmentioning
confidence: 99%
“…The railway system model was implemented in a rail simulator based on the 'quasi static' backwards looking method, due to its short simulation times for estimating energy consumption of vehicles following an imposed speed cycle [46]. The rail simulator is a multi-stage program, implemented in Visual Basic and Fortran language and operating in MS-DOS and the Microsoft Excel workspace [59][60][61], including:…”
Section: Simulation Proceduresmentioning
confidence: 99%
“…That is, within 10 s, the rotor (artificially) remains stationary. From this experiment, we find at which current, according to (4,5), the moments are equalized and we obtain the start time of the starter rotor movement. For greater obviousness, the time axis is given by an uneven scale since, starting from 1.5 to 10 s, the process proceeds relatively smoothly.…”
Section: Electromagnetic Transition Processes At a Stationary Rotormentioning
confidence: 99%
“…That is likely due to the complexity of selecting the parameters for existing supercapacitors, starters, and rechargeable batteries. The results of studying the system of guaranteed power supply with various power drives are reported in [4]. In particular, the authors investigated an option to start a diesel generator only from the supercapacitor.…”
Section: Introductionmentioning
confidence: 99%
“…The railway system model was implemented in a rail simulator based on the 'quasi static' backwards looking method, due to its short simulation times for estimating energy consumption of vehicles following an imposed speed cycle [46]. The rail simulator is a multi-stage program, implemented in Visual Basic and Fortran language and operating in MS-DOS and the Microsoft Excel workspace [59][60][61], including:…”
Section: Simulation Proceduresmentioning
confidence: 99%
“…The train performance, computed in the Microsoft Excel environment, requires the main characteristics of the route as input data, namely the plano-altimetric characteristics of the line (slopes), the curvature radius of the curves, speed limits and tunnels. Moreover, it requires electromechanical information of the rolling stock such as: weight, aerodynamic resistance, traction and braking force [46,59]. Given these inputs, and with a calculation step in meters, it is possible to obtain several outputs such as:…”
Section: Train Performance Simulationmentioning
confidence: 99%