How Does the European Recovery Target for Construction & Demolition Waste Affect Resource Management?

Abstract: The revised EU Waste Framework Directive (WFD) includes a 70 % target for recovery of construction and demolition (C&D) waste. In order to study the potential change in the resource management of the main C&D waste fractions, as a consequence of fulfilling the WFD target, a Nordic project (ENCORT-CDW) has been performed. Waste fractions studied included asphalt, concrete, bricks, track ballast, gypsum-based construction materials and wood. Recovery scenarios were identified and estimations were made regarding … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
30
0
1

Year Published

2018
2018
2022
2022

Publication Types

Select...
6
3
1

Relationship

0
10

Authors

Journals

citations
Cited by 52 publications
(31 citation statements)
references
References 2 publications
0
30
0
1
Order By: Relevance
“…Also, several authors have criticized the European Directive as being ineffective. Arm et al (2017) states that the Directive is very sensitive to how the legal definitions of waste and recovery are interpreted among the Member States. They also mention that the Directive does not distinguish between the various recovery processes and also that its weight-based approach favors large and heavy waste streams.…”
Section: Potential Barriermentioning
confidence: 99%
“…Also, several authors have criticized the European Directive as being ineffective. Arm et al (2017) states that the Directive is very sensitive to how the legal definitions of waste and recovery are interpreted among the Member States. They also mention that the Directive does not distinguish between the various recovery processes and also that its weight-based approach favors large and heavy waste streams.…”
Section: Potential Barriermentioning
confidence: 99%
“…It would strip landfill covering from its current recovery status, thus necessitating opting for alternative recovery strategies for fines in order to fulfil the ELV directive targets. The measure has been advocated as necessary to initiate waste recovery strategies in general (Arm et al, 2017), and its implementation is likely given the increasing focus towards the value-added recovery of industrial residues on the EU level (European Commission, 2011). This measure would also strengthen the ELV directive's requirements for only thermal recovery other than recycling, thus prompting shredding companies to ponder valorisation strategies for fines instead of disposal-oriented ones.…”
Section: Challenging the Current Disposal-oriented Practicementioning
confidence: 99%
“…In the LCA approach, energy consumption and CO 2 emission are the two most evaluated impact categories [ 98 ]. Application of the LCA method can be classified into six aspects: environmental impacts of a building [ 44 , 99 , 100 ], environmental impacts of construction waste in the construction phase [ 101 , 102 ], environmental impacts of demolition waste in the end-of-life phase [ 103 , 104 ], environmental impacts of demolition waste in the refurbishment phase [ 105 ], environmental impacts of recycled aggregates [ 106 , 107 , 108 , 109 ], and environmental impacts under different CDW management strategies [ 14 , 110 , 111 , 112 , 113 ]. Results show that, compared with landfill, most of waste recycling and reuse methods bring net environmental benefits [ 14 , 101 , 106 , 110 ].…”
Section: Comprehensive Framework For the Ma-cdwmentioning
confidence: 99%