2012
DOI: 10.2298/ntrp1203319b
|View full text |Cite
|
Sign up to set email alerts
|

Human reliability analysis of the Tehran research reactor using the SPAR-H method

Abstract: The purpose of this paper is to cover human reliability analysis of the Tehran research reactor using an appropriate method for the representation of human failure probabilities. In the present work, the technique for human error rate prediction and standardized plant analysis risk-human reliability methods have been utilized to quantify different categories of human errors, applied extensively to nuclear power plants. Human reliability analysis is, indeed, an integral and significant part of probabilist… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
5
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 12 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…Task processing time refers to the time available to operators or personnel to diagnose and take action during abnormal events [28]. This Performance Shaping Factor (PSF) shows independence from other PSFs, considering the ratio of available time to required time in the cabin.…”
Section: Standard For Determining the Level Of Psfs In The Cab Of Tow...mentioning
confidence: 99%
See 2 more Smart Citations
“…Task processing time refers to the time available to operators or personnel to diagnose and take action during abnormal events [28]. This Performance Shaping Factor (PSF) shows independence from other PSFs, considering the ratio of available time to required time in the cabin.…”
Section: Standard For Determining the Level Of Psfs In The Cab Of Tow...mentioning
confidence: 99%
“…It encompasses narrowed attention and muscle tension, including anxiety. Environmental factors, known as pressure sources, such as heat, noise, poor ventilation, or radiation, can induce stress and affect operator mental or physical performance [28]. This PSF intersects with task complexity, responsibility, adaptability, and human-environment factors [26].…”
Section: Standard For Determining the Level Of Psfs In The Cab Of Tow...mentioning
confidence: 99%
See 1 more Smart Citation
“…Importance measures, including Fussell‐Vesely (FV), risk reduction worth (RRW), risk achievement worth (RAW), and Birnbaum (BI) 17 that are extensively used in probabilistic safety assessment (PSA) 18,19 were introduced and adapted to PSFs and PSF levels as part of a decision‐making evaluation HEP process. The proposed importance analysis quantifies the relative contributions of PSFs and PSF levels to the HEP.…”
Section: Introductionmentioning
confidence: 99%
“…The ex tremely strong earth quake (8.9 in Rich ter scale) at 14:46 on March 11, 2011, and the con se quent dev as tat ing tsu nami, al most 30 min utes af ter the earthquake, hit the north ern east of Ja pan. This caused the most se vere nu clear ac ci dent af ter the Chernobil's 1986 which was due to the hu man er ror as the main rea son of nu clear in dus try ac ci dents [1]. Fukushima Dai-ichi nu clear power plant (NPP) with 6 re ac tors was the cen ter of this ac ci dent, where units 5 and 6 were for tu nately in the cold shut down for main tenance.…”
Section: Introductionmentioning
confidence: 99%