“…Therefore, they not necessarily are the best options to be applied to the examined hospital buildings, such as: whole envelope insulation, windows replacement, cool materials for mitigating the summer cooling load [38], advanced HVAC control system [39], AHU heat recovery units, renewable energy technologies; etc. Unfortunately, all such additional actions could not be considered in this analysis for feasibility reasons.…”