2023
DOI: 10.2139/ssrn.4375830
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

Hygrothermal Performance of Thick Pcm Mortar Behind Pv Panel in Energy Activated Etics Facade

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(8 citation statements)
references
References 0 publications
0
0
0
Order By: Relevance
“…As waterproof MC4 connectors were used to make the connections, no special junction box was needed. The exact building process and detailing of the solution has been described before, in [16].…”
Section: Test Wall In Climate Chambermentioning
confidence: 99%
See 4 more Smart Citations
“…As waterproof MC4 connectors were used to make the connections, no special junction box was needed. The exact building process and detailing of the solution has been described before, in [16].…”
Section: Test Wall In Climate Chambermentioning
confidence: 99%
“…Moreover, volumetric moisture content inside the PCM mortar was measured with EC-5 soil moisture sensors [25]. The sensors were calibrated specifically for measuring this PCM mortar, as the result of several small-scale experiments and formulas for calculating volumetric moisture content with temperature corrections [16].…”
Section: Sensors Used For Measurementmentioning
confidence: 99%
See 3 more Smart Citations