2021
DOI: 10.1155/2021/6661099
|View full text |Cite
|
Sign up to set email alerts
|

Identification and Assessment of Subway Construction Risk: An Integration of AHP and Experts Grading Method

Abstract: Qing Dao is one of the earliest cities that included the idea of subway construction into the city’s transportation plan. However, the construction period of a subway project is long, and the uncertainties caused by the geological conditions and surrounding environments are huge, thus a risk assessment method in subway construction is essential. To ensure the tunnel safety, many researchers have raised different methods for risk assessment. The process of risk assessment can be characterized in three steps: (1… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 10 publications
(5 citation statements)
references
References 11 publications
0
5
0
Order By: Relevance
“…e construction site risk assessment needs feasible methods, and the commonly used safety assessment methods at home and abroad mainly include safety checklist (SCL) [27,28], fuzzy comprehensive evaluation method (Fuzzy) [9,29,30], analytic hierarchy process (AHP) [31][32][33], fault tree analysis (FTA) [34,35], support vector machine (SVM) [36,37], and Fuzzy-Analytical Hierarchy process (FAHP) [38]. ese methods not only provide the theoretical basis for the production practice, but also lay the foundation for the subsequent theoretical research.…”
Section: Introductionmentioning
confidence: 99%
“…e construction site risk assessment needs feasible methods, and the commonly used safety assessment methods at home and abroad mainly include safety checklist (SCL) [27,28], fuzzy comprehensive evaluation method (Fuzzy) [9,29,30], analytic hierarchy process (AHP) [31][32][33], fault tree analysis (FTA) [34,35], support vector machine (SVM) [36,37], and Fuzzy-Analytical Hierarchy process (FAHP) [38]. ese methods not only provide the theoretical basis for the production practice, but also lay the foundation for the subsequent theoretical research.…”
Section: Introductionmentioning
confidence: 99%
“…Liu [88] pointed out that the prediction of possible future risks of a project is based on existing data, calculation theory and experience, so that the reliability and credibility of its results depend to a large extent on the practical experience and knowledge of the evaluators.…”
Section: Discussionmentioning
confidence: 99%
“…It has the unique capability to distill the insights and intuitive judgments of experienced professionals into tangible data that can guide pivotal decisions. Since its inception in the 1970s, the AHP has become an indispensable tool for navigating complex decision-making landscapes, applicable in a wide array of fields, from shaping public policy to crafting nuanced business strategies [99][100][101][102][103][104][105][106][107][108][109].…”
Section: Analytic Hierarchy Process (Ahp)mentioning
confidence: 99%