2019 International Conference on Computer and Information Sciences (ICCIS) 2019
DOI: 10.1109/iccisci.2019.8716390
|View full text |Cite
|
Sign up to set email alerts
|

Identification of scope creep factors and their impact on software project success

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2
2

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(7 citation statements)
references
References 25 publications
0
7
0
Order By: Relevance
“…Komal et al [3] proved that inability to manage scope creep leads to project failure, more than 80% of software project failed as the result of poor controlling of scope creep. Nevertheless, numerous organizations are not aware of the serious parts of scope creep, hence conducted study contributes to decrease the chances of projects failure by identifying and analysing the critical factors that are responsible for scope creep proved by using a systematic review based on 29 selected paper.…”
Section: Related Workmentioning
confidence: 99%
See 3 more Smart Citations
“…Komal et al [3] proved that inability to manage scope creep leads to project failure, more than 80% of software project failed as the result of poor controlling of scope creep. Nevertheless, numerous organizations are not aware of the serious parts of scope creep, hence conducted study contributes to decrease the chances of projects failure by identifying and analysing the critical factors that are responsible for scope creep proved by using a systematic review based on 29 selected paper.…”
Section: Related Workmentioning
confidence: 99%
“…The proposed model is not tested in real projects. Investigating and identifying the critical factors of scope creep and its influence on project success [3] The paper requires more validation on real projects due to the absence of observation proof available in the reviewed literature. Improvement of Earned Scope Management (ESM) strategy for measuring and checking project performance [4] There is a need to integrate ESM) Earned Scope Management with Earned Value Management (EVM) to obtain accurate result of project performance.…”
Section: Titlementioning
confidence: 99%
See 2 more Smart Citations
“…A survey was conducted to validate identified factors of scope creep from industry experts using research instruments. The quantitative research method is defined as "the systematic investigation of phenomena by gathering quantifiable data and performing statistical, mathematical or computational techniques" [74]. The results obtained from the quantitative analysis are considered reliable and objective by the majority of the experts and researchers [75].…”
Section: ) Sample and Data Collectionmentioning
confidence: 99%