Impact of transmission line overloads on network reliability and conductor ageing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6

Relationship

2
4

Authors

Journals

citations
Cited by 13 publications
(11 citation statements)
references
References 8 publications
0
11
0
Order By: Relevance
“…Active power flow between two busses with voltages V 1 and V 2 and having respective angles is given by Equation (1) [1].…”
Section: Stability Issues Of Power Transmissionmentioning
confidence: 99%
See 1 more Smart Citation
“…Active power flow between two busses with voltages V 1 and V 2 and having respective angles is given by Equation (1) [1].…”
Section: Stability Issues Of Power Transmissionmentioning
confidence: 99%
“…Therefore, practical power systems are highly interconnected. Due to excessive interconnections, network restructuring, and dynamic load patterns, some transmission lines operate well above their thermal and stability limits [1]. The voltage profile of the power system gets affected by the uneven loading of transmission lines that leads to an unstable power system.…”
Section: Introductionmentioning
confidence: 99%
“…Apart from the load demand, overloading also occurred due to human errors and protection failures, which cause line tripping. Thus, advanced protection schemes and faulty assessments need to be implemented to avoid unnecessary tripping during operation and prevent thermal overload in transmission lines [64], [86], [89]- [91].…”
Section: ) Overloadmentioning
confidence: 99%
“…From (10), ΔP L, j age is modelled as the extra power flow on line L j computed when considering zero EDR availability (i.e. ΔP L, j age ) and power reduction (due to available EDR) equivalent to the proportion L,j from the DR power (P j EDR ) at the receiving end bus j of line L j .…”
Section: γγ1 Minimising Ens At Bus J (Ens J )mentioning
confidence: 99%
“…Once the ageing risks and benefits are determined, the NOs could make informed decisions on either accepting those ageing risks or defining appropriate actions to manage and mitigate them. Till now, there is very limited literature combining reliability benefits and network ageing risks resulted from EL and PLR [9,10]. Although a few studies capture the ageing risks accompanied by the EL operation of OHLs [11][12][13], they fail to define proper economic solutions for minimising those risks.…”