2016
DOI: 10.1088/1674-1137/40/4/047002
|View full text |Cite
|
Sign up to set email alerts
|

Impedance measurements of the extraction kicker system for the rapid cycling synchrotron of China Spallation Neutron Source

Abstract: The Rapid Cycling Synchrotron (RCS) of China Spallation Neutron Source (CSNS) includes eight modules of the ferrite kicker magnets with window-frame geometry. The fast extraction kicker system is one of the most important accelerator components, whose inner structure will be the main source of the impedance in the RCS. It is necessary to understand the kicker impedance before its installation into the tunnel. The conventional and improved wire methods are employed for the benchmarking impedance measurement res… Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 24 publications
0
4
0
Order By: Relevance
“…Conventional and improved wire methods were employed to measure the impedance as shown in Fig. 7, before its installation into the tunnel [13]. The small oscillation sideband of the longitudinal and vertical impedance is due to the mismatching between the kicker magnet and the pulse form network.…”
Section: Extraction Kickermentioning
confidence: 99%
See 2 more Smart Citations
“…Conventional and improved wire methods were employed to measure the impedance as shown in Fig. 7, before its installation into the tunnel [13]. The small oscillation sideband of the longitudinal and vertical impedance is due to the mismatching between the kicker magnet and the pulse form network.…”
Section: Extraction Kickermentioning
confidence: 99%
“…The RCS accelerates the beam up to 1. 6 GeV with a repetition rate of 25 Hz, aiming to provide a 100 kW output beam power with an intensity of 1.56 × 10 13 at an injection energy of 80 MeV. At present, the beam power has reached 140 kW with an intensity of 2.18 × 10 13 , 40 % more than the nominal power.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The simulation code based on AT [11] has also been developed in order to analyze a mechanism of realistic RFKO and to realize more precise control. The maximum spiral step is bigger than 4.5 mm.…”
Section: Extraction Design and Simulationmentioning
confidence: 99%