2015
DOI: 10.20961/performa.14.2.11488
|View full text |Cite
|
Sign up to set email alerts
|

Implementasi Prinsip Ekonomi Gerakan Untuk Pengaturan Tata Letak Fasilitas Kerja Pada Pemrosesan Batu Alam

Abstract: <span><em>The layout and arrangement of production facilities is one key to productive and efficient working </em><span><em>environment. In planning and setting the layout of the factory, one of the basic principles that should be </em><span><em>considered is the planning of work stations. Every operation must be designed in detail by applying </em><span><em>economic principles in the movement of goods to and from work station. The study was con… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
1
0
2

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 0 publications
0
1
0
2
Order By: Relevance
“…Based on eight papers, workplace design during the past two decades has had three main objectives: increasing productivity, improving working comfort, and reducing the physical disorders (see Figure 3). Increasing productivity, which is the most dominant goal, is achieved through reducing the processing time, improving working time efficiency, and reducing energy consumption (Dewi et al, 2015;Sari, 2012;Trisusanto et al, 2020;Wibawa, 2010;Wicaksana and Nugroho, 2017). The improvement of working comfort was obtained by designing workstation according to the worker's body size and providing safer and more comfort workplace (Mulyati et al, 2004;Sutalaksana and Widyanti, 2016).…”
Section: Workplace Design In the Sub-micro-level (Worktation Area)mentioning
confidence: 99%
“…Based on eight papers, workplace design during the past two decades has had three main objectives: increasing productivity, improving working comfort, and reducing the physical disorders (see Figure 3). Increasing productivity, which is the most dominant goal, is achieved through reducing the processing time, improving working time efficiency, and reducing energy consumption (Dewi et al, 2015;Sari, 2012;Trisusanto et al, 2020;Wibawa, 2010;Wicaksana and Nugroho, 2017). The improvement of working comfort was obtained by designing workstation according to the worker's body size and providing safer and more comfort workplace (Mulyati et al, 2004;Sutalaksana and Widyanti, 2016).…”
Section: Workplace Design In the Sub-micro-level (Worktation Area)mentioning
confidence: 99%
“…The results of previous research indicate that six types of facilities layouts are widely applied in Indonesian manufacturing SMEs, namely fixed layout, hybrid/combination layout, process layout, fractal layout, GT/cellular layout and product layout (Dewi, Sari, Dewi & Ariyono, 2015;Fahma & Sakinah, 2014;Morena & Siska, 2011;Prasetya & Noya, 2015;Santoso & Halim, 2012). So, the authors propose these six types of facilities layouts in the layout selection flowchart in Indonesian manufacturing SMEs.…”
Section: Quantity and Product Variety Ratio Type Of Processmentioning
confidence: 99%
“…Para produsen juga membeli bahan baku dengan upaya mendapatkan harga termurah sehingga hal tersebut memberikan gambaran bahwa setiap produsen berupaya menerapkan atau mengimplementasikan prinsip ekonomi guna mencapai tujuan yang diharapkan. Hal ini sesuai dengan hasil penelitian (Dewi et al, 2015) bahwa prinsip-prinsip ekonomi gerakan diterapkan dalam pengembangan rancangan sehingga pekerjaan menjadi lebih mudah, cepat dan nyaman bagi pekerja. Pengimplementasian prinsip ekonomi memberikan gambaran nyata terkait cara produsen untuk mendapatkan hasil yang optimal.…”
Section: Hasil Dan Pembahasanunclassified