2016
DOI: 10.1007/s00170-016-8878-8
|View full text |Cite
|
Sign up to set email alerts
|

Implementation of fuzzy TOPSIS methodology in selection of procedural approach for facility layout planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
19
0
1

Year Published

2016
2016
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 33 publications
(20 citation statements)
references
References 25 publications
0
19
0
1
Order By: Relevance
“…Traditionally, most approaches tackling the facilities layout planning have followed the systematic layout planning methodology (SLP) introduced by Muther [73]. A recent study concluded that this was the most appropriate approach to handle facility layout design problems [74]. Like most engineering design problems, SLP methodology is based on a hierarchical approach, starting with a block layout phase and followed by a detailed phase [75,76].…”
Section: Current Trends In the Dflp Formulationmentioning
confidence: 99%
“…Traditionally, most approaches tackling the facilities layout planning have followed the systematic layout planning methodology (SLP) introduced by Muther [73]. A recent study concluded that this was the most appropriate approach to handle facility layout design problems [74]. Like most engineering design problems, SLP methodology is based on a hierarchical approach, starting with a block layout phase and followed by a detailed phase [75,76].…”
Section: Current Trends In the Dflp Formulationmentioning
confidence: 99%
“…Tradicionalmente, la mayoría de los enfoques de solución del problema de la DP han seguido la metodología de planificación sistemática de distribución (systematic layout planning, SLP) [52]. Una investigación reciente concluyó que este era el enfoque más adecuado para manejar problemas de diseño de DP [53].…”
Section: Tabla I Estrategia De Revisión De La Literaturaunclassified
“…Singh et al [32] introduced the concept of three-level AHP heuristic approach with a new normalization procedure and a new heuristic method to generate objective weights for a multi-objective facility layout issue. Sharma et al [33] applied the fuzzy TOPSIS methodology to the best selection of procedural approach for facility layout planning. Kumar et al [34] proposed a hybrid interpretive structural modeling (ISM) and decisionmaking trial and evaluation laboratory (DEMATEL) method approach to figure out the hierarchal and contextual relation structure among the barriers of e-waste recycling management.…”
Section: Introductionmentioning
confidence: 99%
“…However, determining how to evaluate the ELV disassembly plant layout scientifically is still a problem that needs to be solved. Generally, two types of approaches are employed to address this issue in the view of multi-criteria decision making (MCDM): 1) correlation degree assessment approaches, e.g., weighted sum [42]- [44], TOPSIS [28], [45], AHP [46] and fuzzy synthetic evaluation [33], [47], [48] and 2) the approaches DEMATEL [29], [49]. On the other hand, to our knowledge, hybrid gray correlation and fuzzy DEMATEL approaches have not been employed to solve the ELV plant facility layout problem.…”
Section: Introductionmentioning
confidence: 99%