2014
DOI: 10.1016/j.ijepes.2014.03.018
|View full text |Cite
|
Sign up to set email alerts
|

Implementation of time domain transformer winding models for fast transient analysis using Simulink

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 13 publications
0
1
0
Order By: Relevance
“…Due to the devastating effect that transient overvoltages can have on transformers, such as insulation breakdown, it is very helpful and important to have an accurate simulation of the LI test during the transformer design process. A transient analysis of distribution and power transformers can be found in various papers [1][2][3][4][5][6][7][8][9][10], while there are a lack of papers on instrument transformers [11,12]. Due to their specific design, it is of great value to investigate transient analysis of voltage transformers.…”
Section: Introductionmentioning
confidence: 99%
“…Due to the devastating effect that transient overvoltages can have on transformers, such as insulation breakdown, it is very helpful and important to have an accurate simulation of the LI test during the transformer design process. A transient analysis of distribution and power transformers can be found in various papers [1][2][3][4][5][6][7][8][9][10], while there are a lack of papers on instrument transformers [11,12]. Due to their specific design, it is of great value to investigate transient analysis of voltage transformers.…”
Section: Introductionmentioning
confidence: 99%