“…Specific CCPM techniques, especially buffer sizing, has been studied and criticised, particularly in the works of Tukel, Rom, and Eksioglu (2006), Chu (2008), Buchmann-Slorup (2014), Zhang, Song, and Díaz (2014), , Zhang, Song, and Díaz (2016), Hu et al (2017) and Zhang, Song, and Díaz (2017). Concomitantly, new scheduling methods were tested in multiproject environment, with propositions that associate such methods with CCPM techniques (Liu, Song, and Tang 2006;Wang et al 2014;Yang and Fu 2014;Zhang, Jia, and Díaz 2015;Zheng et al 2014).…”