2020
DOI: 10.1016/j.promfg.2020.02.121
|View full text |Cite
|
Sign up to set email alerts
|

Improving MRO order processing by means of advanced technological diagnostics and data mining approaches

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 8 publications
(10 citation statements)
references
References 10 publications
0
10
0
Order By: Relevance
“…Once all components are ready for installation, the capital goods are reassembled and quality assurance can be completed. [2] Despite increasing condition monitoring parallel to operation, there still remains high uncertainty of information regarding the actual damage patterns, a strong customer influence during order processing, frequent changes in the work content or scope, and a high level of information uncertainty regarding the expected capacity and material requirements [21]. These factors lead to significant production logistics turbulence and significantly increased process variance [22,23].…”
Section: A Use Case Of An Mro Service Providersmentioning
confidence: 99%
See 1 more Smart Citation
“…Once all components are ready for installation, the capital goods are reassembled and quality assurance can be completed. [2] Despite increasing condition monitoring parallel to operation, there still remains high uncertainty of information regarding the actual damage patterns, a strong customer influence during order processing, frequent changes in the work content or scope, and a high level of information uncertainty regarding the expected capacity and material requirements [21]. These factors lead to significant production logistics turbulence and significantly increased process variance [22,23].…”
Section: A Use Case Of An Mro Service Providersmentioning
confidence: 99%
“…The need for robustness is mainly dependent on the remaining, not anticipated (load) uncertainty left in the process. A reduction of this uncertainty is, among others, possible by analysing load data from previous orders or field data using modern methods of predictive data analytics [21,71]. The remaining load uncertainty that cannot be eliminated until the start of order processing can be modelled as a statistical distribution and thus enables the derivation of different load scenarios [72].…”
Section: Procedures For Deriving a Structurementioning
confidence: 99%
“…Similarly, the unknown-work phenomenon also pushes the schedule towards potential delays. For example, an aircraft sometimes reaches its performance limits long before its compressor limiting operating cycles [9]. As a result, it needs extra restoration work.…”
Section: Problems Associated With Traditional Aircraft Maintenance Pr...mentioning
confidence: 99%
“…If the resulting A value is smaller than the α-cut value = 0.5, then the item will be rejected because it shows the approval of the experts in rejecting the item, and vice versa [46]. The defuzzification process is carried out by determining the average fuzzy number's average value (m1, m2, m3) as described in equation (3).…”
Section: Stage 14: Calculating Threshold Values and Determining Conse...mentioning
confidence: 99%