2022
DOI: 10.1016/j.conbuildmat.2022.127422
|View full text |Cite
|
Sign up to set email alerts
|

Improving the accuracy of pavement structural quality assessment by correcting numerical hypothetical model of modulus Back-Calculation through GPR

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 38 publications
0
1
0
Order By: Relevance
“…where đ” is the total bandwidth, 𝑁 is the number of frequency steps, and 𝑓 is the step frequency. The last parameter describing the GPR signal in the step-frequency system is the dwell time or pulse repetition interval, which is defined as the time taken to transmit the signal corresponding to each frequency [49]. [48].…”
Section: Multi-frequency 3d Gprmentioning
confidence: 99%
“…where đ” is the total bandwidth, 𝑁 is the number of frequency steps, and 𝑓 is the step frequency. The last parameter describing the GPR signal in the step-frequency system is the dwell time or pulse repetition interval, which is defined as the time taken to transmit the signal corresponding to each frequency [49]. [48].…”
Section: Multi-frequency 3d Gprmentioning
confidence: 99%