2018
DOI: 10.1016/j.trpro.2018.12.121
|View full text |Cite
|
Sign up to set email alerts
|

Improving the system of traffic management at crossings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…The intensity of creating a car at the beginning of the road or the task of a time interval is also set. Change in the probabilities of route formation is possible [12][13][14].…”
Section: Formal Description Of Elements and Construction Of A Transpomentioning
confidence: 99%
“…The intensity of creating a car at the beginning of the road or the task of a time interval is also set. Change in the probabilities of route formation is possible [12][13][14].…”
Section: Formal Description Of Elements and Construction Of A Transpomentioning
confidence: 99%
“…Then, the effectiveness matrix of action scenarios under various ESs shall have the form: It has been found in studies [21,[41][42][43][44] that there is a relationship between the Pareto set in multicriterion tasks and the zoning method for solving "games with nature"-related problems under uncertainty [45][46][47][48]. Provided that the effectiveness function of the differential state vector is continuous, the matrix game with nature can be reduced to a linear vector optimization problem [49][50][51][52].…”
mentioning
confidence: 99%