“…The performed protocol of simulation for all systems was containing “minimization, annealing, and a final 50 ns and 100 ns NPT (isothermal–isobaric) ensemble production simulation”. 77,78 During the NPT production simulation, temperature and pressure were considered to be fixed using a Langevin thermostat 79 and barostat. 80 In the NPT production run, the Langevin piston target was set to 1 atm.…”