2019
DOI: 10.1016/j.enpol.2019.03.011
|View full text |Cite
|
Sign up to set email alerts
|

Influential factor analysis of China's unsustainable electric power system: A case study of Chengdu Electric Bureau

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2020
2020
2025
2025

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 24 publications
0
3
0
Order By: Relevance
“…for consumers when the government cannot cover the deficit caused by subsidizing. Xu et al (2019) reveals that natural disasters, weak grid power exchange capacity, weak grid support, weak emergency power support, and protection mistakenly moved are the main threats for unsustainable electric power system using Chengdu Electric Bureau as a case. Xie et al (2021) indicate that the unbundling reform implemented in China has not improved the service quality of the power grid firms.…”
Section: Literature Reviewmentioning
confidence: 99%
“…for consumers when the government cannot cover the deficit caused by subsidizing. Xu et al (2019) reveals that natural disasters, weak grid power exchange capacity, weak grid support, weak emergency power support, and protection mistakenly moved are the main threats for unsustainable electric power system using Chengdu Electric Bureau as a case. Xie et al (2021) indicate that the unbundling reform implemented in China has not improved the service quality of the power grid firms.…”
Section: Literature Reviewmentioning
confidence: 99%
“…With this regard, by applying HoQ method, they found that increasing communication with capacity facilities is the best strategy to overcome this problem. Also, Xu et al [43] established an Entropy-House of Quality method to define the main factors that are common in unsustainable electric power system in China. According to results, it is identified that verifying policy-makers' effectiveness is a valuable strategy for blackout prevention.…”
Section: Literature Reviewmentioning
confidence: 99%
“…After converting the ADTree into an A2DTree, we can use the success tree method [34] to determine the path set of the A2DTree. We can first identify the dual tree [35] of an A2DTree by replacing all the AND logic gates in the original A2DTree with OR logic gates and replacing all the OR logic gates with AND logic gates. On this basis, the cut set of this dual tree is the path set of the original A2DTree.…”
Section: Minimum Defense Cost Calculationmentioning
confidence: 99%