Abstract: Industrialised Building System [IBS] is a new method that used prefabrication components in building construction as an alternative towards enhancing construction performance.  The Construction Industry Development Board [CIDB] embraced the IBS method to enhance productivity and building quality, reduce wastage on site, increase occupational safety and health, and reduce overall cost of construction.  Currently, most of the IBS project developments in Malaysia are still adopting traditional procurement system.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…Based on the above discussion, it can be summarised that these issues can be minimised by improving the procurement through an innovative procurement such as Integrated Project Delivery (IPD), separation of IBS procurement from the main contract, and partnering (Hu & Chong, 2020;Ariffin et al, 2018). Therefore, it is crucial to conduct research that is expected to introduce innovative procurement for IBS projects in Malaysia.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…Based on the above discussion, it can be summarised that these issues can be minimised by improving the procurement through an innovative procurement such as Integrated Project Delivery (IPD), separation of IBS procurement from the main contract, and partnering (Hu & Chong, 2020;Ariffin et al, 2018). Therefore, it is crucial to conduct research that is expected to introduce innovative procurement for IBS projects in Malaysia.…”
Section: Discussionmentioning
confidence: 99%
“…Moreover, according to Zairul (2022), the benefits of IBS cannot be realised if outdated conventional methods and strategies are still employed. There are several research by Viana et al (2020), Hu & Chong (2020), Ariffin et al (2018), and Nawi et al (2014) that recommend an increase in integration by changing from traditional procurement to innovative procurement. This statement is also in line with a study done by Saad et al (2022), which confirms that enhanced procurement and contracting can clearly define client needs.…”
Section: Traditional Procurement Approach Unsuitable For Ibs Projectsmentioning