2006
DOI: 10.1080/00207540500525262
|View full text |Cite
|
Sign up to set email alerts
|

Inserting cost effectiveness to the ergonomic equation when considering practical solutions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2009
2009
2021
2021

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…Although there are a limited number of digital human modeling and virtual human simulation tools (Hu et al, 2011;Duffy, 2007;Lamkull et al, 2009;Gilad and Elnekave, 2006;Yang et al, 2009;Rajan, 1999;Otto and Scholl, 2011), it is questionable whether they are accessible, cost-effective, and practical in manufacturing environments (Perez, in press), and whether they provide meaningful design recommendations to engineers (Kaljun, 2012). We agree with others that HFS have failed to provide useful models, checklists, methodologies, and tools to help designers (Clegg et al, 1996;Wulff, 1999), and that there is a need for improved proactive HF methods and tools appropriate for production engineers (Ma et al, 2010;Falck and Rosenqvist, 2012;Teperi and Leppanen, 2011;Wells et al, 2007).…”
Section: Adaptation Of Industrial Engineering Tools To Include Hf Can Facilitate Integration Of Hfmentioning
confidence: 99%
“…Although there are a limited number of digital human modeling and virtual human simulation tools (Hu et al, 2011;Duffy, 2007;Lamkull et al, 2009;Gilad and Elnekave, 2006;Yang et al, 2009;Rajan, 1999;Otto and Scholl, 2011), it is questionable whether they are accessible, cost-effective, and practical in manufacturing environments (Perez, in press), and whether they provide meaningful design recommendations to engineers (Kaljun, 2012). We agree with others that HFS have failed to provide useful models, checklists, methodologies, and tools to help designers (Clegg et al, 1996;Wulff, 1999), and that there is a need for improved proactive HF methods and tools appropriate for production engineers (Ma et al, 2010;Falck and Rosenqvist, 2012;Teperi and Leppanen, 2011;Wells et al, 2007).…”
Section: Adaptation Of Industrial Engineering Tools To Include Hf Can Facilitate Integration Of Hfmentioning
confidence: 99%
“…In the work of Go et al (2011), the MOST is applied to quantify the difficulty scores of a disassembly operation to enhance the recycling rate. Besides, Gilad and Elnekave (2006) proposed an approach of developing a cost-effective ergonomic solution in which the MOST is used to assess the operator capabilities and attained improvements.…”
Section: Introductionmentioning
confidence: 99%
“…Third, most HF tools are illequipped to predict design problems, where more costeffective changes can be applied. A limited number of digital human modeling and virtual human simulation tools (like 3D SSPP or EAI Jack, ErgoMan) are being used in large companies, especially automotive (Rajan et al, 1999;Gilad & Elnekave, 2006;Duffy, 2007;Lamkull et al, 2009;Yang et al, 2009;Hu et al, 2011;Otto & Scholl, 2011). However, it is questionable whether these tools are accessible, cost-effective, and practical in manufacturing environments (Perez & Neumann, in press) and whether they provide meaningful design recommendations to engineers (Kaljun & Dolsak, 2012).…”
Section: Introductionmentioning
confidence: 99%