2018
DOI: 10.1109/mim.2018.8278805
|View full text |Cite
|
Sign up to set email alerts
|

Instrumentation and measurement testing in the real-time lab for automation of complex power systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0
1

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(7 citation statements)
references
References 11 publications
0
6
0
1
Order By: Relevance
“…The power flow at each operating point used to investigate all power system operating constraints during optimization process. The objective function ( ) represents can be formulated by (1)(2)(3)(4) as follows:…”
Section: Research Methods 21 Objective Function Formulationmentioning
confidence: 99%
See 2 more Smart Citations
“…The power flow at each operating point used to investigate all power system operating constraints during optimization process. The objective function ( ) represents can be formulated by (1)(2)(3)(4) as follows:…”
Section: Research Methods 21 Objective Function Formulationmentioning
confidence: 99%
“…The electrolyte should be efficiently able to conduct protons from anode to cathode [19] The FC unit considered as power-only system fueled by hydrogen. When the hydrogen pumped through the anode, it ionizes releasing electrons and produces H+ ions (protons) which flow through electrolyte (Polymer) as in (1). Released electrons move through external electric circuit towards the cathode.…”
Section: Fuel Cell Systemmentioning
confidence: 99%
See 1 more Smart Citation
“…For implementing a certain control process, the production plants and their embedded systems must be modernized and optimized [2], this allows to monitor the variables that are being controlled and grants that the plant is working under safety conditions for the operator and even for the control system. It is also made to establish the method or the way in which the system will be regulated, this adaptation is known as instrumentation [3]. Overall, when a control and instrumentation systems are executed under minimal or null human intervention, the system is called automated [4], in order to take a modern approach to control, this work proposes the use of Fuzzy as an algorithm for two simulated industrial applications [5].…”
Section: Introductionmentioning
confidence: 99%
“…In order to realize the unmanned duty in the true sense, it is necessary to establish a TPSAS with high reliability, maintainability and real-time control, and manage and control the primary equipment of the entire traction power supply system to ensure efficient and safe traction power supply system [2]. At present, all systems are operated independently, the traffic scheduling and traction power supply scheduling are separated, and PSDS and PSMIS are not connected [3]. The level of automation in traction substations is uneven.…”
Section: Introductionmentioning
confidence: 99%