2000
DOI: 10.1177/1063293x0000800302
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Engineering Environments for Large Complex Products

Abstract: An introduction is given to the Engineering Design Centre at the University of Newcastle upon Tyne, along with a brief explanation of the main focus towards large made-to-order products. Three key areas of research at the Centre, which have evolved as a result of collaboration with industrial partners from various sectors of industry, are identified as (1) decision support and optimisation, (2) design for lifecycle, and (3) design integration and co-ordination. A summary of the unique features of large made-to… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2002
2002
2019
2019

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…The overall duration, however, for a single server to perform a number of events sequentially or simultaneously is expected to be the same, providing that the server has a single processor. These and other operational design coordination issues are further discussed by Coates et al (2000bCoates et al ( , 2000c and .…”
Section: Server Managementmentioning
confidence: 99%
“…The overall duration, however, for a single server to perform a number of events sequentially or simultaneously is expected to be the same, providing that the server has a single processor. These and other operational design coordination issues are further discussed by Coates et al (2000bCoates et al ( , 2000c and .…”
Section: Server Managementmentioning
confidence: 99%
“…Unfortunately, despite the need for research on the engineering process, the vast majority of research performed for ETO firms by such authors as Pongcharoen (2006, 2009), Hicks and Braiden (2000), Hicks et al ( , 2001Hicks et al ( , 2007, Pongcharoen, Hicks, and Braiden (2004), Pongcharoen, Hicks, Braiden, and Stewardson (2002), and Song, Hicks, and Earl (2001, 2002 recommends complex global shop floor scheduling approaches which seek to replace ERP systems. Coates, Ritchey, Duffy, Hills, and Whitfield (2000) provide the only discussion found which focuses on the ETO engineering process. They present an agent-based design decision evaluation tool for large make-to-order products.…”
Section: Introductionmentioning
confidence: 99%