2015
DOI: 10.5121/ijcsit.2015.7503
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Project Management Measures in CMMI

Abstract: Project management is quite important to execute projects effectively and efficiently. Project management is vital to projects success. The main challenge of project management is to achieve all project goals, taking into consideration time, scope, budget constraints, and quality. This paper will identify general measures for the two specific goals and its ten specific practices of Integrated Project management Process Area in Capability Maturity Model Integration (CMMI). CMMI is a framework for improvement an… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 15 publications
0
2
0
Order By: Relevance
“…Various researches aimed to measure the software process that has been suggested, such as [21,[31][32][33][34][35][36][37][38][39][40][41]. The works that are related the most to our work are represented in the works of [21,31,32,[35][36][37][38][39][40][41]. Baumertand McWhinney [42] point out to several observations that are usefulfor measuring the practices (general characteristics) that are defined in the Capability Maturity Model for CMM/SW.…”
Section: The Relevant Workmentioning
confidence: 99%
See 1 more Smart Citation
“…Various researches aimed to measure the software process that has been suggested, such as [21,[31][32][33][34][35][36][37][38][39][40][41]. The works that are related the most to our work are represented in the works of [21,31,32,[35][36][37][38][39][40][41]. Baumertand McWhinney [42] point out to several observations that are usefulfor measuring the practices (general characteristics) that are defined in the Capability Maturity Model for CMM/SW.…”
Section: The Relevant Workmentioning
confidence: 99%
“…Loconsole [13] (CMM/SW), rather than (CMMI/SW). Khraiwesh, [31,[35][36][37][38][39]41] identifies a set of measures for processessuch as validation, process and product quality assurance, risk management, project planning, project monitoring and control, and configuration management in CMMI/SW.…”
Section: The Relevant Workmentioning
confidence: 99%