2019
DOI: 10.1016/j.autcon.2018.12.024
|View full text |Cite
|
Sign up to set email alerts
|

Integrating Building Information Modeling and Prefabrication Housing Production

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
99
0
5

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
5

Relationship

2
8

Authors

Journals

citations
Cited by 168 publications
(105 citation statements)
references
References 58 publications
1
99
0
5
Order By: Relevance
“…The factors are grouped into political, economic, social, and technological factors, which should be considered to determine the optimal level of pre-fabrication. Li et al (2019) found that constraint management is of vital importance in building information modeling for pre-fabricated houses. Song et al (2005) and Tam et al (2007) found that a successful implementation of modular and off-site construction techniques requires early decision making and analyses based on the specific project's circumstances.…”
Section: Pros and Cons Of Modular And Off-site Constructionmentioning
confidence: 99%
“…The factors are grouped into political, economic, social, and technological factors, which should be considered to determine the optimal level of pre-fabrication. Li et al (2019) found that constraint management is of vital importance in building information modeling for pre-fabricated houses. Song et al (2005) and Tam et al (2007) found that a successful implementation of modular and off-site construction techniques requires early decision making and analyses based on the specific project's circumstances.…”
Section: Pros and Cons Of Modular And Off-site Constructionmentioning
confidence: 99%
“…They concluded that the schedule delay was mainly caused by the design information gap between designers and manufacturers, the low interoperability between different enterprises and the delivery delay of prefabricated products. To improve the visibility and traceability of prefabricated products, the internet of things (IoT)-enabled Building Information Modeling (BIM) platform was suggested for achieving just-in-time (JIT) coordination [8][9][10]. These studies are helpful to mitigate the uncertainties within phase schedule.…”
Section: Prefabrication Housing Production (Php) In Hong Kongmentioning
confidence: 99%
“…Moreover, the manufacturer may learn from other benchmark manufacturers through interactions among manufacturers. All agents' decisions may adjust dynamically, with the products' green degree changing accordingly [34]. As a result, the green degree of the manufacturing industry evolves nonlinearly.…”
Section: Agent-based Modelingmentioning
confidence: 99%