2006
DOI: 10.1016/j.autcon.2005.09.007
|View full text |Cite
|
Sign up to set email alerts
|

Intelligence approach to production planning system for bespoke precast concrete products

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
23
0

Year Published

2009
2009
2024
2024

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 52 publications
(24 citation statements)
references
References 15 publications
1
23
0
Order By: Relevance
“…The findings extend those of Benjaoran and Dawood [31] and Pan et al [32], confirming that an effective shop floor control in off-site construction can augment production outputs significantly.…”
Section: Summary and Discussionsupporting
confidence: 84%
See 1 more Smart Citation
“…The findings extend those of Benjaoran and Dawood [31] and Pan et al [32], confirming that an effective shop floor control in off-site construction can augment production outputs significantly.…”
Section: Summary and Discussionsupporting
confidence: 84%
“…Furthermore, object-oriented models have been developed for projects with highly repetitive processes such as house building [29,30]. However, there is little research that has explored the potential of developing customized production tracking mechanisms for off-site construction that can generate real-time feedback on the progress towards periodic production targets to adjust capacity parameters [31,32]. In the next section, the process of autonomous production tracking in off-site construction will be discussed.…”
Section: Research Backgroundmentioning
confidence: 99%
“…The components that are frequently seen in the non-volumetric pre-assembly type are precast concrete, steel, and wood. Research on such type includes detailed design of prefabricated building (Retik and Warszawskit 1994), production scheduling and tool development (Benjaoran and Dawood 2006;Leu and Hwang 2002), decision-making on components and assembly methods (Pereyra and Romero 2009;Chen et al 2010), transportation and on-site assembly , in the order of time. Studies on modular building project management include the development of tools and applications for productivity improvement (Han et al 2012;Moghadam et al 2012) and the quality control of the modular products (Kim et al 2016;Yu et al 2013).…”
Section: Trends Of Osc Management Papers Over Timementioning
confidence: 99%
“…Hong et al (2005) described the construction technique utilized with the composite tubes and discussed the many advantages of the tubes over temporary propping systems. Benjaoran and Dawood (2006) suggested products that are prefabricated off‐site, offering a unique opportunity for innovation and cost savings for construction projects. Mirghaderi and Renani (2008) proposed a connection in which two beams pass next to the column faces without interruption and are connected to the column flanges by vertical plates.…”
Section: Introductionmentioning
confidence: 99%