2016
DOI: 10.1051/matecconf/20168605019
|View full text |Cite
|
Sign up to set email alerts
|

Intensification of the investment process of construction

Abstract: Abstract. The article provides negative trends of braking development of the investment process of creating buildings and structures and describes the dynamic system of the investment process and its components given the basis of domestic and foreign experience. It also categorizes the factors influencing the duration of the investment process, which are presented as procedural, engineering design and manufacturing. The article discloses the accounting procedures of these factors by measuring their information… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2017
2017
2019
2019

Publication Types

Select...
6

Relationship

4
2

Authors

Journals

citations
Cited by 14 publications
(9 citation statements)
references
References 3 publications
0
9
0
Order By: Relevance
“…The findings of Russian and foreign researchers give a reason to conclude that further reducing of facility making investment process duration is reached mainly via revealing and considering of factors that harmonize various steps of construction and reducing of their duration [4,9,10,11].…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…The findings of Russian and foreign researchers give a reason to conclude that further reducing of facility making investment process duration is reached mainly via revealing and considering of factors that harmonize various steps of construction and reducing of their duration [4,9,10,11].…”
Section: Methodsmentioning
confidence: 99%
“…Investment process in project-making includes many stages, most important of them are: feasibility study, engineering, preparation for construction, construction, commissioning [1,2,3,4].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…In this regard, its developers completely reject the mechanical demolition of the building structures with excavators, as this activity produces a large scattering of pieces of the destroyed structures, strong dust emission and noise generation, as well as a significant increase in the complexity of the sorting and shipment of the demolition materials [4,5,6]. To replace this method of demolition of buildings there were involved the modern excavators-destroyers, equipped with hydraulic shears, bucket, hydraulic hammer and grab.…”
Section: Problem Statementmentioning
confidence: 99%
“…In questions of studying OTR there are cases of estimation of borders of change of intensity of production of CIW [22], for example, "at decomposition of the main elements of the construction project [23]". The author of this work shares the need to assess the internal (hidden) capabilities of organizational and technological solutions of construction [24,25].…”
Section: Introductionmentioning
confidence: 99%