2000
DOI: 10.1016/s1474-6670(17)38089-8
|View full text |Cite
|
Sign up to set email alerts
|

Interactive factory planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2001
2001
2013
2013

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…From a control perspective, it is more appropriate to define a specification for new desired behaviour and to determine whether the specification can be met through a set of controllable events (Hendry and Kingsman 1989, Sihn et al 2000, Kim et al 2001.…”
Section: Introductionmentioning
confidence: 99%
“…From a control perspective, it is more appropriate to define a specification for new desired behaviour and to determine whether the specification can be met through a set of controllable events (Hendry and Kingsman 1989, Sihn et al 2000, Kim et al 2001.…”
Section: Introductionmentioning
confidence: 99%
“…A number of analytical and simulation models dealing with the problem of system performance prediction and verification, fail when addressing the issue of performance evaluation of a whole system where performance depends on the synchronization of their interactions. From the control perspective it is more appropriate to define a specification for some new desired behavior, and determine whether the specification can be met through a set of controllable events [1,2]. A problem of multiassortment and multi-version production planning and control is presented and the method and support systems are described in the paper.…”
mentioning
confidence: 99%