“…Regarding the reliability of mathematical mould growth models, previous studies [49], [67]- [71] indicate that the mathematical models are not able to precisely predict the extent of the mould growth infestation, but should instead be used to predict the likelihood of mould growth occurring in the structure or as a comparative tool to evaluate different design solutions. The experimental findings from the field study [42], [43] showed large discrepancies between on-site tests and model predictions. The application of the mould-growth model in this study was therefore used to assess the observed tendencies which include temperature, RH and time into the risk evaluation.…”