Following the industrial trend of increasingly integrative design and analysis of the combustorturbine interface, the EC FP7 project FACTOR was launched many years ago. The project ended in late 2017 after successful completion of the experimental test campaign involving blank-sheet design rotating turbine rig hardware, which was assembled, integrated and operated in DLR's turbine test facility NG-Turb in Göttingen, Germany. This paper highlights the DLR contribution to FACTOR including the 1.5 stage turbine rig's mechanical design, instrumentation and integration as well as final part assembly to a working rig. Additionally, DLR was responsible for rig operation and overall measurement campaign fulfilment including the acquisition of static pressure and temperature data as well as aerothermal 5-hole-probe traverses in different measurement planes. The implemented combustor simulator created a characteristic flow profile to and through the turbine with strongly varying flow angles and temperatures, that posed a challenge for the applied measurement techniques. NOMENCLATURE