2022
DOI: 10.31660/0445-0108-2022-5-98-107
|View full text |Cite
|
Sign up to set email alerts
|

Investigating drilling fluid formulations to penetrate productive horizons with high-viscosity formation fluids

Abstract: It draws our attention to the processes of interaction between the well and the penetrated permeable formations during its construction, which are largely determined by geological and thermobaric conditions, types of fluid saturating the formation, used technologies and technical means. The article deals with the main problems of well construction intended for the high-viscosity oil production. Laboratory and experimental studies have been conducted to solve these issues, they will help to scientifically subst… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 1 publication
0
4
0
Order By: Relevance
“…The conducted set of experiments and the analysis of scientific and technical literature made it possible to develop an algorithm for creating excess pressure in the annular space, included in the Measures developed by JSC "SevKavNIPIgaz" to improve the quality of well cementing. Since 2009, these Measures have been successfully implemented in the cementing of production strings of high-performance wells of the Nevsky UGS [9], which…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…The conducted set of experiments and the analysis of scientific and technical literature made it possible to develop an algorithm for creating excess pressure in the annular space, included in the Measures developed by JSC "SevKavNIPIgaz" to improve the quality of well cementing. Since 2009, these Measures have been successfully implemented in the cementing of production strings of high-performance wells of the Nevsky UGS [9], which…”
Section: Discussionmentioning
confidence: 99%
“…It has been established that when the BHZ is chemically fixed with binders, the pore space interval is partially filled with hardening products and the reservoir permeability decreases. In this regard, when strengthening the cemented sandstone of the flooded BHZ interval, an important criterion for optimizing the strengthening is not only to ensure the strength of sand fixation, but also to maintain the filtration characteristics of the treated interval [1,2].…”
Section: Introductionmentioning
confidence: 99%
“…The conducted set of experiments and the analysis of scientific and technical literature made it possible to develop an algorithm for creating excess pressure in the annular space, included in the Measures developed by JSC "SevKavNIPIgaz" to improve the quality of well cementing. Since 2009, these Measures have been successfully implemented in the cementing of production strings of high-performance wells of the Nevsky UGS [7], which was reflected in their use in the development of the normative document Recommendation Gazprom.…”
Section: Discussionmentioning
confidence: 99%
“…It has been established that when the BHZ is chemically fixed with binders, the pore space interval is partially filled with hardening products and the reservoir permeability decreases. In this regard, when strengthening the cemented sandstone of the flooded BHZ interval, an important criterion for optimizing the strengthening is not only to ensure the strength of sand fixation, but also to maintain the filtration characteristics of the treated interval [8,9].…”
Section: Introductionmentioning
confidence: 99%