2020
DOI: 10.1016/j.ijepes.2019.105418
|View full text |Cite
|
Sign up to set email alerts
|

Investigating tension in overhead high voltage power transmission line using finite element method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
12
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 17 publications
(12 citation statements)
references
References 14 publications
0
12
0
Order By: Relevance
“…Several studies have been carried out on different methods of uprating, including increased conductor rating, increased conductor temperature, increased thermal rating by active line rating system, probabilistic rating, high surge impedance, and increased electrical clearances [35][36][37][38][39][40][41][42][43][44]. The studies cover different techniques such as conductor replacement, conductor tension, line thermal, conductors bundling, and increased conductor attachment height [18,[45][46][47][48][49][50][51]. A number of studies have been carried out on power transfer capability through voltage uprating, which has reduced line losses and voltage drops compared to current uprating [2,32].…”
Section: Voltage Uprating Issues and Challenges In Malaysiamentioning
confidence: 99%
“…Several studies have been carried out on different methods of uprating, including increased conductor rating, increased conductor temperature, increased thermal rating by active line rating system, probabilistic rating, high surge impedance, and increased electrical clearances [35][36][37][38][39][40][41][42][43][44]. The studies cover different techniques such as conductor replacement, conductor tension, line thermal, conductors bundling, and increased conductor attachment height [18,[45][46][47][48][49][50][51]. A number of studies have been carried out on power transfer capability through voltage uprating, which has reduced line losses and voltage drops compared to current uprating [2,32].…”
Section: Voltage Uprating Issues and Challenges In Malaysiamentioning
confidence: 99%
“…With prolonged high currents of transmission lines develops high tension areas in the span of the length of the transmission lines. With this, the paper of Ahmad, Y. Jin, C. Zhu, I. Javed, and M. Waqar Akram [21] aims to pinpoint the location of such high-tension zones using an analysis of these high current areas. The tension of the overhead transmission line caused by the high current was calculated using the finite element method.…”
Section: Review Of Related Literaturementioning
confidence: 99%
“…Sag determination is to obtain a safe distance of the object below the overhead conductor and to determine the conductor length and tower height [2][3][4][5]. Several studies on sag and safety distance have been undertaken [6][7][8][9][10][11]. In [6] the method of calculating sag with the effect of conductor weight, tensile strength, span distance, elevation angle between two towers, temperature and wind is presented.…”
Section: Introductionmentioning
confidence: 99%
“…The sag is measured by using a line inspection robot in [8]. In [9][10][11] the authors apply simulation or finite element modelling methods to calculate the sag or safety distance.…”
Section: Introductionmentioning
confidence: 99%