2018
DOI: 10.1007/s10845-018-1450-7
|View full text |Cite
|
Sign up to set email alerts
|

Joint optimization of capacity, production and maintenance planning of leased machines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 45 publications
0
3
0
Order By: Relevance
“…According to Equations ( 21) and ( 22), among the seven orders, orders 1 and 2 are high-level orders, orders 3 and 4 are intermediate-level orders, and orders 5, 6 and 7 are basic-level orders. Among the 36 machines, machines 1, 2, 3,4,10,11,12,13,19,20,21,22,28,29,30 and 31 belong to the high-health group machine set, machines 5,6,7,14,15,16,23,24,25,32,33 and 34 belong to the medium-health group machine set, and machines 8, 9, 17, 18, 26, 27, 35 and 36 belong to the sub-health group machine set.…”
Section: Production Line Configuration and Random Cases Generation 1)...mentioning
confidence: 99%
See 1 more Smart Citation
“…According to Equations ( 21) and ( 22), among the seven orders, orders 1 and 2 are high-level orders, orders 3 and 4 are intermediate-level orders, and orders 5, 6 and 7 are basic-level orders. Among the 36 machines, machines 1, 2, 3,4,10,11,12,13,19,20,21,22,28,29,30 and 31 belong to the high-health group machine set, machines 5,6,7,14,15,16,23,24,25,32,33 and 34 belong to the medium-health group machine set, and machines 8, 9, 17, 18, 26, 27, 35 and 36 belong to the sub-health group machine set.…”
Section: Production Line Configuration and Random Cases Generation 1)...mentioning
confidence: 99%
“…Xu [9] considered stochastic periodic maintenance in parallel machine scheduling and set minimising the maximum completion time as an optimization goal. Zied [10] conducted joint optimization of capacity, production, and maintenance plans under the constraint of leased machines. They utilised the branch and bound algorithm to reduce machine maintenance costs.…”
Section: Introductionmentioning
confidence: 99%
“…Besides, [7] used an artificial neural network approach coupled with a simulation tool to estimate the minimum number and the best scheduling of machines that enhance the mean tardiness and the mean flow time. In fact, [8] used two analytical methods to firstly, determine the optimal number of machines and the quantities produced in each period and secondly, determine the production plan and the periodic preventive maintenance scheduling to reduce the failures and minimize the total costs. Moreover, [9] used Discrete-Event Simulation (DES) and OptQuest to find out the optimal machine number.…”
Section: Machine Selection Problemmentioning
confidence: 99%