Geotechnical Risk in Rock Tunnels 2006
DOI: 10.1201/9780203963586.ch10
|View full text |Cite
|
Sign up to set email alerts
|

Koralm tunnel – benefits of a structured design and investigation process – the client’s view

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0
1

Year Published

2010
2010
2011
2011

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 0 publications
0
3
0
1
Order By: Relevance
“…Also extensive new developments and innovations in geophysical investigation were initiated for the Koralm Tunnel project, as have already been reported elsewhere [3] [4].…”
Section: Fig 2 Overview Of the Route Bild 2 Trassenverlauf Im üBermentioning
confidence: 99%
See 1 more Smart Citation
“…Also extensive new developments and innovations in geophysical investigation were initiated for the Koralm Tunnel project, as have already been reported elsewhere [3] [4].…”
Section: Fig 2 Overview Of the Route Bild 2 Trassenverlauf Im üBermentioning
confidence: 99%
“…Working from an investigation of the construction and operation phases of the Koralm Tunnel, the tunnel system was decided with two single-track running tunnels, cross- [3] cuts every 500 m and an emergency stop in the middle of the tunnel. For the development of an optimized tunnel cross-section in the operating phase, the decisive aspects were the safety of the tunnel and also maintenance and repair, energy consumption and the aerodynamic properties.…”
Section: Project-specific Further Developments 31 Optimisation Of Thmentioning
confidence: 99%
“…Neben einem mehrphasigen Erkundungsprogramm aus ingenieur-und hydrogeologischen Kartierungen sowie umfangreichen Tiefenerkundungen wurde zur Vorbereitung der Bauausschreibungen ab 2003 ein insgesamt rund 10 km langes Erkundungstunnelsystem, bestehend aus den Baulosen bei Leibenfeld, Mitterpichling und Paierdorf ausgeführt (Bild 1) [1].…”
Section: Introductionunclassified
“…In addition to a multi-phase exploration program using engineering and hydrogeological mapping as well as extensive subsurface exploration, an exploratory tunnel system with a total length of about 10 km, consisting of the sections near Leibenfeld, Mitterpichling and Paierdorf, was carried out to assist the preparation for construction tenders starting in 2003 ( Figure 1) [1].…”
Section: Introductionmentioning
confidence: 99%