Lean manufacturing and Toyota Production System terminology applied to the procurement of vascular stents in interventional radiology

Abstract: ObjectivesTo apply the economic terminology of lean manufacturing and the Toyota Production System to the procurement of vascular stents in interventional radiology.MethodsThe economic- and process-driven terminology of lean manufacturing and the Toyota Production System is first presented, including information and product flow as well as value stream mapping (VSM), and then applied to an interdisciplinary setting of physicians, nurses and technicians from different medical departments to identify wastes in t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0
1

Year Published

2015
2015
2023
2023

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 17 publications
(13 citation statements)
references
References 19 publications
0
12
0
1
Order By: Relevance
“…Elimination of waste (Muda) includes both wastes, i.e. waste created through overburden ("Muri") and waste created through unevenness (de Bucourt et al, 2011). "Value" is any action or process that a customer would be willing to pay for; that is, the value of a product is defined solely by the customer.…”
Section: Benefits Of Lean Manufacturingmentioning
confidence: 99%
See 1 more Smart Citation
“…Elimination of waste (Muda) includes both wastes, i.e. waste created through overburden ("Muri") and waste created through unevenness (de Bucourt et al, 2011). "Value" is any action or process that a customer would be willing to pay for; that is, the value of a product is defined solely by the customer.…”
Section: Benefits Of Lean Manufacturingmentioning
confidence: 99%
“…SMED (Kumar and Kumar, 2012) Following sequenced and structured work instructions to perform and finish the job within minimum possible time 3. Kanban (M de Bucourt, 2011;Wong and Wong, 2011) Communicating customer requirement from downstream to upstream worker so as to replenish the moved quantity by the new one 4. Total Productive Maintenance/TPM/ (Kumar and Kumar, 2012) It involves: cleaning, lubricating, inspection, tightening activity of machines to reduce break down time and enhances operational efficiency of machines 5.…”
Section: Ijlss 102mentioning
confidence: 99%
“…If ( , ) = 1, it means that station can process operation . In addition, ( , ) subjects to the constraints represented by Equations ( 7) and (8). If the chromosome is infeasible, it will be corrected by altering one gene randomly from 0 to 1 to meet the minimum requirement.…”
Section: Encodementioning
confidence: 99%
“…Seven potential sources of wastes including over-production, waiting, transportation, over-processing, inventory, motion, and defects, are often mentioned that need due consideration during lean implementation [6,7]. Some researchers also add excess human resources as the eighth waste [8].…”
Section: Introductionmentioning
confidence: 99%
“…This key and decisive factor influences the final cost of the product however, among the activities carried out in the supply chain, it is considered as a necessary activity that does not generate more value to the product. This is the reason why, its cost seeks to be minimized [17,26,40]. Transport models as mentioned in [21]; can be solved by the known VRP (Vehicle Routing Problem) which its objective is to find the optimal set of routes for a fleet of vehicles that must meet the demands of a given set of customers.…”
Section: Introductionmentioning
confidence: 99%