Linear LAV‐based state estimation integrating hybrid SCADA/PMU measurements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 31 publications
(14 citation statements)
references
References 32 publications
0
14
0
Order By: Relevance
“…In this paper, the feeder system as shown in Figure 6 is adopted to verify the effectiveness of the proposed method. is the measure measured at the i unit at the t time cross section, μt,i is the true value of the tidal current measured at the i unit at the t time cross section, σ 2 t,i is the variance of the measure at the i unit at the t time cross section. For a measurement device with the maximum η error, the true value μt,i the standard deviation of the measure is:…”
Section: ⅴ Case Studymentioning
confidence: 99%
See 1 more Smart Citation
“…In this paper, the feeder system as shown in Figure 6 is adopted to verify the effectiveness of the proposed method. is the measure measured at the i unit at the t time cross section, μt,i is the true value of the tidal current measured at the i unit at the t time cross section, σ 2 t,i is the variance of the measure at the i unit at the t time cross section. For a measurement device with the maximum η error, the true value μt,i the standard deviation of the measure is:…”
Section: ⅴ Case Studymentioning
confidence: 99%
“…It stays radiant during normal operation. When fault occurs or optimal control is implemented, the segmented switch and contact line act, and the topology of the distribution network changes [1], [2]. Due to the problems such as missing and false information in the remote transmission data of distribution network, or even the absence of communication channels at some nodes, manual inspection and reporting are required, which results in the failure of timely update of the network topology stored in the system, thus affecting the safe and economic operation of distribution network [3]- [5].…”
Section: Introductionmentioning
confidence: 99%
“…In what follows, firstly SCADA measurements used for SE are formulated based on the results from [31], [32]. Next, the derivations corresponding to PMU measurements including the phase-angle measurements and voltage and current phasor measurements are developed.…”
Section: Exact Linear Formulations For Measurementsmentioning
confidence: 99%
“…Since [H H H] in (28) and therefore [M ] is not constant, δ 2 ,...,δ n in (32), which are estimated in (31), are used to transfer all measurements to the right hand side of (31).…”
Section: B Real Formulationmentioning
confidence: 99%
“…However, regardless of the established linearity, the structure of the algorithm's optimisation problem still imposes considerable computational burden. A linear LAV‐based hybrid estimator, which builds upon the work in [15], was recently proposed in [22] for systems observed by RTU and PMU measurements. The states are estimated in two stages by solving two LP problems, such that the phase angles are estimated by the first LP, while the second provides the estimates of complex bus voltages.…”
Section: Introductionmentioning
confidence: 99%