2021
DOI: 10.1016/j.undsp.2019.08.003
|View full text |Cite
|
Sign up to set email alerts
|

Long rectangular box jacking project: A case study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
12
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 52 publications
(12 citation statements)
references
References 14 publications
0
12
0
Order By: Relevance
“…This technology has undergone rapid development in China despite its relatively late introduction in the country. With the increase need for developing and utilizing underground spaces in urban areas, rectangular pipe jacking technology has been widely employed in diverse applications, such as urban underground pedestrian crossing tunnels [1], entrance tunnels of subway stations D], municipal underground roads and railways [4][5][6], and utility tunnels [7][8][9]. Rectangular jacked pipe tunnels often feature large cross section to satisfy the demands of expressways and large traffic volumes.…”
Section: Introductionmentioning
confidence: 99%
“…This technology has undergone rapid development in China despite its relatively late introduction in the country. With the increase need for developing and utilizing underground spaces in urban areas, rectangular pipe jacking technology has been widely employed in diverse applications, such as urban underground pedestrian crossing tunnels [1], entrance tunnels of subway stations D], municipal underground roads and railways [4][5][6], and utility tunnels [7][8][9]. Rectangular jacked pipe tunnels often feature large cross section to satisfy the demands of expressways and large traffic volumes.…”
Section: Introductionmentioning
confidence: 99%
“…[1][2][3] Nowadays, the development trend of pipe jacking engineering is characterized by longer pipeline, more complex strata and larger pipe diameter and, consequently, more demanding technical performance of jacking pipes are required. [4][5][6] Traditional reinforced concrete pipe (RCP) are frequently used, this being prone to crack during the installation (due to the thrust of the boring machine) and/or during service condition, this leading to jeopardize the durability of the pipeline. 7,8 In this regard, in case of corrosion of the steel bars, the structural safety of the pipeline is compromised and expensive maintenance programs are required, these being a conditioning for the pipeline operativity.…”
Section: Introductionmentioning
confidence: 99%
“…Pipe jacking has widely been used as trenchless pipeline construction technology within the field of oil and gas transmission, hydraulic engineering, and municipal sewage pipelines, among other 1–3 . Nowadays, the development trend of pipe jacking engineering is characterized by longer pipeline, more complex strata and larger pipe diameter and, consequently, more demanding technical performance of jacking pipes are required 4–6 . Traditional reinforced concrete pipe (RCP) are frequently used, this being prone to crack during the installation (due to the thrust of the boring machine) and/or during service condition, this leading to jeopardize the durability of the pipeline 7,8 .…”
Section: Introductionmentioning
confidence: 99%
“…In contrast, advanced trenchless methods, such as the shielding tunneling method and pipe-jacking, are more advantageous because of their reduced negative effect, especially in dense urban areas. The shield tunneling method relies on the costly tunnel boring machine (TBM) and it is applied mainly to segmented tunnels whose diameter is more than 5 m. Pipe-jacking (or microtunneling method) is used to construct small-diameter utility tunnels such as sewerage, gas and water mains, oil pipelines, electricity and telecommunications cable ducts, and drainage culverts (3)(4)(5)(6)(7).…”
mentioning
confidence: 99%
“…The pipe-jacking method outperforms traditional trench methods in many aspects, such as lower environmental disturbance, lower overall cost, shorter construction period, and less rehabilitation ( 4 , 8 ). As shown in Figures 1 and 2, the schematic of the earth pressure balance (EPB) pipe-jacking method is presented, and the main construction process consists of the following steps: (a) The TBM machine is installed at the launch shaft by lifting equipment and positioned at the designated distance ahead of the hydraulic jacking system; (b) the first tunnel segmental ring is put between the TBM machine and the jacking rigs, and is then pushed into the ground.…”
mentioning
confidence: 99%