The roundhead buttress dam for the Zeya hydroelectric station has a height of 112 m, crest length of 714 m, and volume of about 2,200,000 m 3 of concrete,Reservoir filling began in Aug. 1975 and the first unit was put under load in November.The dam is divided lengthwise into 44 sections of three types: fixed gravity and buttress at abutments, single buttress on the spillway part, and double buttress in the powerhouse part.Galleries for grouting and drainage, measuring 3.5x 3.5 m in section, are constructed at the base of the upstream column of the sections.The distance between axes of the galleries is 7.5 m. In the bank sections the grouting gallery is inclined with a stepped invert.The drainage gallery consists of individual horizontal segments.A Lower Paleozoic intrusion of diorites with veins of lamprophyres and porphyrites of Mesozoic Age form the foundation of the dam.The intrusion extends latitudinally as a band 5-6 km wide.The deep Pikan fault, the formation of which affected the preservation of the rock foundation, is the southern boundary of the rock mass.Six systems of tectonic fractures and zones were traced in the foundation pit during documenting of the site.The predominant strike of the fractures is northeast.In the area of the main structures there are 12 tectonic zones with a thickness of more than 0.5 m and in individual cases more than 3 m. The largest tectonic zone of meridional direction cuts across the axis of the dam in the region of spillway section No. 13. The thickness of the shattered and mylonitized rocks in the zone reaches 10-15 m, and the rocks at the contact with the zone are intensely fractured (Fig. i).A second large tectonic zone in the latitudinal direction with a 60-80 ~ dip toward the upper pool is exposed in the channel and flanks (zone No. 1-8).In the channel it passes i0-15 m from the upstream face of the dam and in the flanks cuts across the foundation in the regions of sections 3-6 and 36-40.A tectonic crack up to 0.5 m thick, filled with gouge, is traced along the entire zone.The blocky structure of the rock caused by the joints is mainly within 10-20 cm.The fracture voids ratio in the channel area is within 0.005-0.15% and in the flanks 0.5-1%.The diorite mass, as we see from the permeability profile (Fig. i) obtained by testing boreholes in the first stage of the grout curtain, is characterized mainly by specific water absorption values less than 0.05 liter/min.Zones of increased permeability are generally individual pockets confined to the largest tectonic fractures and extending to a depth of 30-40 m.Individual absorbing zones are found at a depth of 50-60 m, but we can consider that for depths over 60 m the foundation is practically impervious.The grouting and drainage work in the foundation of the dam* called for 36,000 linear meters of grouting and ii,000 linear meters of drain wells.The project included a deep grout curtain made up of two rows of drilled holes (20,700 m), stabilizing grouting in the foundation of the upstream column (8300 m) and grouting of the ...
The roundhead buttress dam for the Zeya hydroelectric station has a height of 112 m, crest length of 714 m, and volume of about 2,200,000 m 3 of concrete,Reservoir filling began in Aug. 1975 and the first unit was put under load in November.The dam is divided lengthwise into 44 sections of three types: fixed gravity and buttress at abutments, single buttress on the spillway part, and double buttress in the powerhouse part.Galleries for grouting and drainage, measuring 3.5x 3.5 m in section, are constructed at the base of the upstream column of the sections.The distance between axes of the galleries is 7.5 m. In the bank sections the grouting gallery is inclined with a stepped invert.The drainage gallery consists of individual horizontal segments.A Lower Paleozoic intrusion of diorites with veins of lamprophyres and porphyrites of Mesozoic Age form the foundation of the dam.The intrusion extends latitudinally as a band 5-6 km wide.The deep Pikan fault, the formation of which affected the preservation of the rock foundation, is the southern boundary of the rock mass.Six systems of tectonic fractures and zones were traced in the foundation pit during documenting of the site.The predominant strike of the fractures is northeast.In the area of the main structures there are 12 tectonic zones with a thickness of more than 0.5 m and in individual cases more than 3 m. The largest tectonic zone of meridional direction cuts across the axis of the dam in the region of spillway section No. 13. The thickness of the shattered and mylonitized rocks in the zone reaches 10-15 m, and the rocks at the contact with the zone are intensely fractured (Fig. i).A second large tectonic zone in the latitudinal direction with a 60-80 ~ dip toward the upper pool is exposed in the channel and flanks (zone No. 1-8).In the channel it passes i0-15 m from the upstream face of the dam and in the flanks cuts across the foundation in the regions of sections 3-6 and 36-40.A tectonic crack up to 0.5 m thick, filled with gouge, is traced along the entire zone.The blocky structure of the rock caused by the joints is mainly within 10-20 cm.The fracture voids ratio in the channel area is within 0.005-0.15% and in the flanks 0.5-1%.The diorite mass, as we see from the permeability profile (Fig. i) obtained by testing boreholes in the first stage of the grout curtain, is characterized mainly by specific water absorption values less than 0.05 liter/min.Zones of increased permeability are generally individual pockets confined to the largest tectonic fractures and extending to a depth of 30-40 m.Individual absorbing zones are found at a depth of 50-60 m, but we can consider that for depths over 60 m the foundation is practically impervious.The grouting and drainage work in the foundation of the dam* called for 36,000 linear meters of grouting and ii,000 linear meters of drain wells.The project included a deep grout curtain made up of two rows of drilled holes (20,700 m), stabilizing grouting in the foundation of the upstream column (8300 m) and grouting of the ...
Construction of the Zeya hydraulic development was started in 1964. the river channel was closed off in 1972, and the first generating unit, with an installed capacity of 215,000 kW, was placed in operation in November 1975. The startup complex Included the following structures: the first stage of the massive buttress dam, two powerhouse sections together with the erection area, the central control desk, the transformer shop, the 220-kV switchyard together with the switchboard block and the compressor room, the trans-shippiag port. and the bridge across the Zeya River.The first start'up scheme for the units of the Zeya plant was worked out during the technical project stage. The periods for commissioning the units and readying the upstream front ( Fig. 1) were adopted on the basis of overall completion of the hydraulic development in 1978. It was assumed that during the first years the reservoir would be filled with an inflow having a 50% frequency of occurrence. The reduced construction ~rne (completion three years after commissioning the first units) and the rapid filing of the reservoir dictated large capital Investments (about 80%), which were necessary for commissioning the ~rst units. Subsequently, other alternatives were considered for placing the first units in operation with lower capital investments. The reduction in the volumes of the startup complex took place in three stages (1971, 1972, and 1973), in each of which optimal solutions compatible with the construction progress were found. The problem of the teehnieoeconomic indices of the startup complex for the first units was solved as part of the general startup scheme for all units, since the solution of this problem only within the limits of the minimal capital investments for commissioning the first units could lead to delays in commissioning the next units or to deterioration of the power-economy indices of the starmp period.The reduction in the capital investments for commissioning the first units was accomplished by the following means: a) Lowering of the startup head. The Francis turbines designed for the project could operate under a head of no less than 50 m" according to factory requirements, for this reason it was necessary to install in the first units temporary runners to be replaced by permanent runners, or to install diagonal turbines, capable of operating under heads of 40-35 m. The technicoeconomic analyses showed the expediency of the use of diagonal turbines. b) Limiting the rate of reservoir filling during the first years within the range of inflows having a 95% frequency. c) S tarring reservoir filling in the second half of the summer with a view to reducing the available storage for receiving the design storm flow. d) Making a detailed analysis of the dam behavior during the different construction stages in order to determine the sequence in dam construction and grouting for maximum reduction in the startup concrete volume while adhering to the minimum allowable stresses at the dam foundation level in the concrete on the upstrea...
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.