1974
DOI: 10.1007/bf02378372
|View full text |Cite
|
Sign up to set email alerts
|

Main structures of Zeya hydropower scheme

Abstract: The Zeya hydropower scheme is under construction in the middle reach of the Zcya River, a large tributary of the Amur River [1]. Included in the structures are a massive buttress dam with a spillway section, a power-station unit with a building adjoining the dam, distribution works and auxiliary operational structures, a permanent bridge over the Zeya River, and a transshipment port. Selection of Type of Concrete DamConsideration was given to gravity, massive buttress, and multiple-arch forms of concrete dams.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

1976
1976
1976
1976

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 3 publications
0
0
0
Order By: Relevance