2018
DOI: 10.1111/jfr3.12455
|View full text |Cite
|
Sign up to set email alerts
|

Managing uncertainty in design flood magnitude: Flexible protection strategies versus safety factors

Abstract: When planning flood protection, agencies are confronted with uncertainty in the design flood magnitude. In particular, the required capacity may increase in the future and render the protection insufficient. This problem can be adressed by applying a safety factor to the design capacity. We propose a Bayesian quantitative sequential decision model that identifies a cost-optimal safety factor in the face of uncertainty. It takes into account the flexibility of the protection system, that is, how costly it is to… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
24
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
4
1
1

Relationship

2
4

Authors

Journals

citations
Cited by 11 publications
(24 citation statements)
references
References 47 publications
0
24
0
Order By: Relevance
“…Dependence between projections is accounted for by using the concept of effective projection number. We demonstrated the estimation of uncertainties and the application of the optimization framework of (Dittes et al, 2017) in a pre-alpine catchment. The results show that for a given sizable internal variability, the protection recommendation is robust to further uncertainty and moderate changes in trend.…”
Section: Discussionmentioning
confidence: 99%
See 4 more Smart Citations
“…Dependence between projections is accounted for by using the concept of effective projection number. We demonstrated the estimation of uncertainties and the application of the optimization framework of (Dittes et al, 2017) in a pre-alpine catchment. The results show that for a given sizable internal variability, the protection recommendation is robust to further uncertainty and moderate changes in trend.…”
Section: Discussionmentioning
confidence: 99%
“…The protection requirement corresponds to the maximal required protection during the time step in question. As in (Dittes et al, 2017), we used a square 30 root cost function for the construction/extension of the protection system and a discounting rate of 2 %. In (Dittes et al, 2017), we considered a measure of flexibility which describes how costly it is to adapt measures later in their life time.…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations