Encyclopedia of Maritime and Offshore Engineering 2017
DOI: 10.1002/9781118476406.emoe385
|View full text |Cite
|
Sign up to set email alerts
|

Marine Warranty Survey for Jack‐Ups

Abstract: This article covers the Marine Warranty Survey aspects applicable to jack‐up marine operations. The standards of care and main technical aspects involved are discussed covering dry transportation, towing operations, and operations on site (going on location, pulling legs and going off location, jacking up, and preloading). Challenges and areas for future work are also discussed.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 16 publications
0
2
0
Order By: Relevance
“…In the marine and offshore industry, the practice of marine warranty services (MWS) is viewed by industry players as a key to guaranteeing asset and operational integrity on industrial-scale projects (TÜV-Rheinland, 2013;Sackey et al, 2021). In other words, MWS surveys go to the core of insurance warranties for project cargoes and operations within the offshore industry (Sackey et al, 2021), although the scope of their operation today extends beyond the offshore and oil and gas industries.…”
Section: Introductionmentioning
confidence: 99%
“…In the marine and offshore industry, the practice of marine warranty services (MWS) is viewed by industry players as a key to guaranteeing asset and operational integrity on industrial-scale projects (TÜV-Rheinland, 2013;Sackey et al, 2021). In other words, MWS surveys go to the core of insurance warranties for project cargoes and operations within the offshore industry (Sackey et al, 2021), although the scope of their operation today extends beyond the offshore and oil and gas industries.…”
Section: Introductionmentioning
confidence: 99%
“…A novel methodology was proposed in [15], where the limiting sea states for pipe-laying operations were derived based on stresses developed in the pipe due to the action of wave and motion of the installation vessel. In [16], a strength-based damage criterion was used, where operational limit corresponding to allowable impact velocity was estimated for jacking up operations. Furthermore, in [17], the stresses developed in the legs of the jack-up were mapped backwards to derive allowable sea states in terms of H s and T p .…”
Section: Introductionmentioning
confidence: 99%