2017
DOI: 10.1016/j.energy.2017.07.005
|View full text |Cite
|
Sign up to set email alerts
|

Mathematical modeling and evolutionary generation of rule sets for energy-efficient flexible job shops

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
42
0
3

Year Published

2018
2018
2023
2023

Publication Types

Select...
4
4
1

Relationship

0
9

Authors

Journals

citations
Cited by 79 publications
(45 citation statements)
references
References 39 publications
0
42
0
3
Order By: Relevance
“…A common objective in these investigations is makespan, as it not only directly measures the time to complete a set of jobs, but also is linked to other important production metrics, e.g., earliness/tardiness of finished jobs and workload. The energy-related objectives include minimization of total energy consumption to process a set of jobs [3,16,19,22,28,33], non-processing energy [16,25], peak power consumption [17], and energy cost [20,25].…”
Section: Literature Review On Energy-aware (Flexible) Job Shop Schedumentioning
confidence: 99%
See 1 more Smart Citation
“…A common objective in these investigations is makespan, as it not only directly measures the time to complete a set of jobs, but also is linked to other important production metrics, e.g., earliness/tardiness of finished jobs and workload. The energy-related objectives include minimization of total energy consumption to process a set of jobs [3,16,19,22,28,33], non-processing energy [16,25], peak power consumption [17], and energy cost [20,25].…”
Section: Literature Review On Energy-aware (Flexible) Job Shop Schedumentioning
confidence: 99%
“…This power input model encompasses idle, switch, and cutting states, where the switch state is a transition to runtime mode. Besides processing and standby states, startup and shutdown states are considered in [33]. The duration of the latter two states enables the switching off-on decision: a machine is switched off if the duration between two adjacent operations is longer than the breakeven duration (i.e., energy consumption of shutdown and startup divided by standby power).…”
Section: Introductionmentioning
confidence: 99%
“…However, three measure criteria are separately optimized in this paper. Zhang et al [47] developed an efficient Gene Expression Programming (eGEP) algorithm for generating rules automatically to achieve effective machine selection, job sequencing, and machine off-on decision making. The single objective function is to minimize the total energy consumption.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Che et al (2017) were the first to develop a mixed integer linear programming (MILP) model for single-machine scheduling problem with turning On and Off strategy, the effectiveness of which is verified by CPLEX SOLVER. A MILP model with the objective of minimising the total energy consumption for flexible job-shop scheduling problem (FJSP) with considering turning On and Off strategy was firstly proposed by Zhang et al (2017).…”
Section: Literature Reviewmentioning
confidence: 99%