2002
DOI: 10.1049/ip-gtd:20020334
|View full text |Cite
|
Sign up to set email alerts
|

Method for computing probability distributions of available transfer capability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2006
2006
2019
2019

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 28 publications
(16 citation statements)
references
References 7 publications
0
16
0
Order By: Relevance
“…These variations in system operating condition are the information which requires large data storage. However, operation practice does not allow storing a large number of systems operating condition data [10][11][12]. To overcome the problem, a small number of system operation conditions are pertinent only for data storage and then it is used in the probabilistic method such as the non-parametric bootstrap technique to produce large number of system operating condition with uncertainty.…”
Section: Estimation Of Transfer Capability Uncertainty Using Parametrmentioning
confidence: 99%
See 1 more Smart Citation
“…These variations in system operating condition are the information which requires large data storage. However, operation practice does not allow storing a large number of systems operating condition data [10][11][12]. To overcome the problem, a small number of system operation conditions are pertinent only for data storage and then it is used in the probabilistic method such as the non-parametric bootstrap technique to produce large number of system operating condition with uncertainty.…”
Section: Estimation Of Transfer Capability Uncertainty Using Parametrmentioning
confidence: 99%
“…On the other hand, considering the fact that ATC is an estimate of the future power transfer availability [10][11][12], therefore, it is important to determine TRM based on a future distribution of ATCs. In this analysis, the historic or inherent variables of ATC (ATC n ) are used as a guide to estimate future distribution of ATCs (ATC n,b ¼ q1 ) for the TRM determination.…”
Section: Trm Determination Using Bootstrap Techniquesmentioning
confidence: 99%
“…Considering the fact that ATC is an estimate of future power transfer availability [6,7,8], therefore it is important to determine TRM based on the future condition of system parameters. Since the future system parameter conditions are not known in this analysis, therefore TRM is obtained based on the system parameter at base case condition.…”
Section: A Transmission Reliability Margin Formulationmentioning
confidence: 99%
“…These variations in system parameter will lead to a large storage of data and the operation practice does not allow storing of a large number of system parameter conditions data [6,7,8]. To overcome the problem of data storage, an improved technique is required in providing large amount of uncertainty from a small sample size of system parameters.…”
Section: A Transmission Reliability Margin Formulationmentioning
confidence: 99%
“…The genetic algorithm [4,5], particle swarm optimization [6], optimal power flow method [7], probability analytical method, stochastic programming method [8], Monte Carlo simulation [9,10], and the enumeration method [11] were adopted for this purpose. For describing the wind power uncertainty, the statistical probability method [12][13][14][15] and scene analysis method [16] are adopted.…”
Section: Introductionmentioning
confidence: 99%