2019
DOI: 10.1007/978-3-030-19501-4_23
|View full text |Cite
|
Sign up to set email alerts
|

Method for Railway Timetable Evaluation in Terms of Random Infrastructure Load

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
5
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 16 publications
0
5
0
Order By: Relevance
“…The traction characteristics of the locomotive are illustrated in Figure 3e. (d) EP09 locomotive [6]; (e) EU44 locomotive 'Siemens EuroSprinter' [59]; (f) Electric multiple unit ED250 'Pendolino' [6].…”
Section: The Rolling Stockmentioning
confidence: 99%
See 3 more Smart Citations
“…The traction characteristics of the locomotive are illustrated in Figure 3e. (d) EP09 locomotive [6]; (e) EU44 locomotive 'Siemens EuroSprinter' [59]; (f) Electric multiple unit ED250 'Pendolino' [6].…”
Section: The Rolling Stockmentioning
confidence: 99%
“…In the case of the 3 kV DC power supply system used on the Polish railway network, such an increase in energy consumption by trains and the installation of additional equipment onboard railway vehicles may lead to overloading the power supply infrastructure [6]. The relatively low voltages (in comparison to the 15 kV AC and 25 kV AC supply systems) and the accumulation of higher-powered units mean very high current values [7].…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…According to the above, one of the most important things in transportation networks' analysis is the finding of the bottlenecks. They impose delays and restrictions in the normal flow of transportation [18][19][20][21][22]. There are three major types of bottlenecks:…”
mentioning
confidence: 99%