Microtunneling Between Piles for Pipeline Replacement

Abstract: { TC \l5 "}The presence of piles supporting primary clarifier basins, along with the risk of settlementinduced damage, led to the use of microtunneling techniques to replace primary sludge drain pipelines at the Jones Island Wastewater Treatment Plant in Milwaukee, Wisconsin. To avoid the clarifier support piles a Soltau RVS 80 microtunnel boring machine was used to replace the 6-inch-diameter pipelines, which were installed 30 feet below the surface. The Soltau boring machine utilized an innovative laser-guid… Show more