{ TC \l5 "}The presence of piles supporting primary clarifier basins, along with the risk of settlementinduced damage, led to the use of microtunneling techniques to replace primary sludge drain pipelines at the Jones Island Wastewater Treatment Plant in Milwaukee, Wisconsin. To avoid the clarifier support piles a Soltau RVS 80 microtunnel boring machine was used to replace the 6-inch-diameter pipelines, which were installed 30 feet below the surface. The Soltau boring machine utilized an innovative laser-guided, steerable pilot tube to establish a pilot alignment between the support piles. When obstructions causing refusal conditions were encountered, the steerable pilot tube was retracted and the pilot alignment was adjusted. The pipeline was then jacked in place behind an auger that followed the pilot tube alignment. This installation method minimized the risk of damaging the support piles and significantly contributed to the success of the pipeline replacements.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.