2015
DOI: 10.2749/222137815818358141
|View full text |Cite
|
Sign up to set email alerts
|

Minimization of Life Cycle Cost for Bridge Asset Management with Multi Stage Optimization

Abstract: <p>The purpose of this study is to minimize life cycle cost (LCC) for bridge asset management. This study attempts to develop an optimization method for bridge maintenance planning. It is realistically difficult to keep the safety level of all bridges within a limited budget. Furthermore, a local government needs to manage a large number of bridges. These cause the difficulty of optimization such as the increase of the number of bridges and strict constraint conditions. However, an optimization of mainte… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2016
2016
2016
2016

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 5 publications
0
0
0
Order By: Relevance